Multi Objective Genetic Algorithm for the Optimized Resource Usage and the Prioritization of the Constraints in the Software Project Planning
نویسندگان
چکیده
Capability Maturity Model Integration (CMMI) helps organizations to improve software development processes. But it contains very little information on process dynamics. It doesn‟t address the following issues like Specific tools, methods and technologies to be followed, Issues in Human resource management, People management methodology and cost attached to people manager. In this paper we focus on the real world problem in the systems development life cycle such as Organizations understaffed, Separation of duties. In order to overcome the problem we have suggested a Multi objective genetic algorithm (MOGA) for minimization of the human resources used. So inturn MOGA has been used to minimize the cost associated, minimize the time involved and to maximize the efficiency by proper usage. The Prioritization of the various constraints involved in the project is also done by the MOGA, which shows a good result over the manual allocation. The results compared with the manual assignment and the comparative results are reported and discussed, which shows the effectiveness of the proposed approach for the project planning.
منابع مشابه
A Genetic Algorithm and a Model for the Resource Constrained Project Scheduling Problem with Multiple Crushable Modes
Abstract: This paper presents an exact model and a genetic algorithm for the multi-mode resource constrained project scheduling problem with generalized precedence relations in which the duration of an activity is determined by the mode selection and the duration reduction (crashing) applied within the selected mode. All resources considered are renewable. The objective is to determine a mode, ...
متن کاملMulti Objective Genetic Algorithm for the optimized Resource usage and the Prioritization of the Constraints in the Software project planning
Capability Maturity Model Integration (CMMI) helps organizations to improve software development processes. But it contains very little information on process dynamics. It doesn’t address the following issues like Specific tools, methods and technologies to be followed, Issues in Human resource management, People management methodology and cost attached to people manager. In this paper we focus...
متن کاملA multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project
This paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. The net present value (NPV) maximization and making span minimization are this study objectives. And since this problem is considered as complex optimization in NP-Hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...
متن کاملAn Efficient Genetic Agorithm for Solving the Multi-Mode Resource-Constrained Project Scheduling Problem Based on Random Key Representation
In this paper, a new genetic algorithm (GA) is presented for solving the multi-mode resource-constrained project scheduling problem (MRCPSP) with minimization of project makespan as the objective subject to resource and precedence constraints. A random key and the related mode list (ML) representation scheme are used as encoding schemes and the multi-mode serial schedule generation scheme (MSSG...
متن کاملA Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm
In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...
متن کامل