Robust Resource-constrained Project Scheduling with Uncertain-but-bounded Activity Durations and Cash Flows I. a New Sampling-based Hybrid Primary-secondary Criteria Approach

نویسنده

  • S. Danka
چکیده

This paper, we presents a new primary-secondary-criteria scheduling model for resourceconstrained project scheduling problem (RCPSP) with uncertain activity durations (UD) and cash flows (UC). The RCPSP-UD-UC approach producing a “robust” resource-feasible schedule immunized against uncertainties in the activity durations and which is on the sampling-based scenarios may be evaluated from a cost-oriented point of view. In the presented approach, it is assumed that each activity-duration and each cash flow value is an uncertain-but-bounded parameter, which is characterized by its optimistic and pessimistic estimations. The evaluation of a given robust schedule is based on the investigation of variability of the makespan as a primary and the net present value (NPV) as secondary criterion on the set of randomly generated scenarios given by a sampling-on-sampling-like process. Theoretically, the robust schedule-searching algorithm is formulated as a mixed integer linear programming problem, which is combined with a cost-oriented samplingbased approximation phase. In order to illustrate the essence of the proposed approach we present detailed computational results for a larger and very challenging project instance. A problem specific fast and efficient harmony search algorithm for large uncertain problems will be presented in a forthcoming paper. Received: 25 March 2013; Accepted: 4 October 2013 Corresponding author: S. Danka, Department of Structural Engineering, University of Pécs H-7624 Pécs, Boszorkány u. 2. Hungary E-mail address: [email protected]. (S. Danka)

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

ROBUST RESOURCE-CONSTRAINED PROJECT SCHEDULING WITH UNCERTAIN-BUT-BOUNDED ACTIVITY DURATIONS AND CASH FLOWS I. A NEW SAMPLING-BASED HYBRID PRIMARY-SECONDARY CRITERIA APPROACH

This paper, we presents a new primary-secondary-criteria scheduling model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations (UD) and cash flows (UC). The RCPSP-UD-UC approach producing a “robust” resource-feasible schedule immunized against uncertainties in the activity durations and which is on the sampling-based scenarios may be evaluated from a cos...

متن کامل

ROBUST RESOURCE-CONSTRAINED PROJECT SCHEDULING WITH UNCERTAIN-BUT-BOUNDED ACTIVITY DURATIONS AND CASH FLOWS II. SOUNDS OF SILENCE: A NEW SAMPLING-BASED HYBRID PRIMARY-SECONDARY CRITERIA HARMONY SEARCH METAHEURISTIC

In this paper, we present a new idea for robust project scheduling combined with a cost-oriented uncertainty investigation. The result of the new approach is a makespan minimal robust proactive schedule, which is immune against the uncertainties in the activity durations and which can be evaluated from a cost-oriented point of view on the set of the uncertain-but-bounded duration and cost param...

متن کامل

Robust Resource-constrained Project Scheduling with Uncertain-but-bounded Activity Durations and Cash Flows Ii. Sounds of Silence: a New Sampling-based Hybrid Primary-secondary Criteria Harmony Search Metaheuristic

In this paper, we present a new idea for robust project scheduling combined with a costoriented uncertainty investigation. The result of the new approach is a makespan minimal robust proactive schedule, which is immune against the uncertainties in the activity durations and which can be evaluated from a cost-oriented point of view on the set of the uncertain-but-bounded duration and cost parame...

متن کامل

A multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations

The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, t...

متن کامل

A Preemptive multimode resource constrained project scheduling model with cash flows

Resource constrained project scheduling problem is one of the most important issues in project planning and management. The objective function of this problem is to minimize the completion time of a project. When there is budget constraint or high risk for investment, using the criteria such as cash flows is so important. The development of computer systems and processors makes it possible to t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2013