In a competitive power market, the task of an independent system operator (ISO) is to ensure full dispatches of the contracted power are carried out reliably. However, if it threatens the system security then ISO makes decision on the re-dispatch of the contracted power i.e., Congestion Management (CM). This paper proposes an optimal congestion management approach in a deregulated electricity market with optimal location of TCSC under Combined Economic Emission Dispatch Environment (CEED) using Particle Swarm optimization with Time Varying Acceleration Co-efficient (PSO-TVAC). Sensitivity factors are used to find the optimal location TCSC. After placing TCSC the investment cost of TCSC and generator rescheduling cost is minimized using Particle Swarm Optimization (PSO) and PSO-TVAC. Numerical results on test system, IEEE 30 bus and IEEE 118 bus systems are presented for illustration purpose and the results are compared with Particle swarm optimization (PSO) in terms of solution quality. The comprehensive experimental results prove that the PSOTVAC is one among the challenging optimization methods which is indeed capable of obtaining higher quality solutions for the proposed problem.
منابع مشابه
Small Signal Stability Improvement and Congestion Management Using PSO Based TCSC Controller
In this paper an attempt has been made to study the application of Thyristor Controlled Series Capacitor (TCSC) to mitigate small signal stability problem in addition to congestion management of a heavily loaded line in a multimachine power system. The Flexible AC Transmission System (FACTS) devices such as TCSC can be used to control the power flows in the network and can help in improvement o...
متن کاملOptimal Allocation of TCSC and DG Unit for Congestion Management in Deregulated Power Systems
Transmission network congestion is an important issue in deregulated power systems, whenever the physical or operational constraints in a transmission network become active, the system is said to be in a state of congestion. Congestion management (CM) is a mechanism to prioritize the transactions and commit to such a schedule that will not overload the network. This paper presents relieving tra...
متن کاملOptimal Placement of Static VAR Compensator to decrease Loadability Margin by a Novel Modified Particle Swarm Optimization Algorithm
In this paper, the Static Var Compensator (SVC) has been used to improve dynamic behaviour of power system. To do this, a new objective function is formulated considering power loss reduction, voltage profile improvement and loadability margin decrease. Other contribution of this research is proposing a novel structure for Particle Swarm Optimization (PSO) algorithm through modifying the initia...
متن کاملOptimal Placement of Static VAR Compensator to decrease Loadability Margin by a Novel Modified Particle Swarm Optimization Algorithm
In this paper, the Static Var Compensator (SVC) has been used to improve dynamic behaviour of power system. To do this, a new objective function is formulated considering power loss reduction, voltage profile improvement and loadability margin decrease. Other contribution of this research is proposing a novel structure for Particle Swarm Optimization (PSO) algorithm through modifying the initia...
متن کاملتعیین بهینه تولید و مکان و اندازه بهینه ادوات FACTS به منظور حذف تراکم خطوط
The application of Flexible AC Transmission System (FACTS) devices shows that they can control the power system technical parameters effectively. However, optimal placement and sizing of them are difficult problems and analytical methods cannot be used to solve these problems. To solve such problems, some evolutionary algorithms are employed. The efficiency of these algorithms is related to the...