Comparison of Due-date Oriented Dispatch Rules in Semiconductor Manufacturing

نویسنده

  • Oliver Rose
چکیده

In this study we compare the cycle-time and on-time-delivery performance of the Critical Ratio (CR), the Earliest Due Date (EDD), and the Operation Due Date (ODD) dispatching rules in semiconductor wafer manufacturing. In addition, we comment on the robustness of the rules to low target flow factor values. It turns out that EDD has almost no positive effect on on-time delivery compared to First-In-First-Out (FIFO) dispatching. CR and ODD, however, reduce the tardiness of lots considerably. ODD dispatching is more robust than CR if the target cycle times for the factory are chosen smaller than the corresponding average cycle times of a factory under FIFO dispatching regime.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Comparison of Dispatching Rules for Semicondutor Manufacturing Using Large Facility Models

In this paper, we present a comparison of five dispatching rules that aim to reduce the mean and the variance of cycle times. The performance of the dispatch rules is evaluated using simulation results for two large semiconductor wafer fabrication facilities. The results show that which dispatch rule achieves the best results depends on the fab, on the load of the fab and on the product.

متن کامل

Accelerating Products under Due-date Oriented Dispatching Rules in Semiconductor Manufacturing

In semiconductor manufacturing facilities, there is often the need to speed up certain product types. This is usually done by either assigning higher priorities or by reducing due dates. In this paper, we study the effects of accelerating one product type by a tighter due date on the on-time delivery performance of the other products manufactured. It turns out that the results depend on the con...

متن کامل

Some Issues of the Critical Ratio Dispatch Rule in Semiconductor Manufacturing

In this paper, we examine the cycle time and on-time delivery performance of a semiconductor wafer fabrication facility (wafer fab) under critical ratio (CR) dispatch regime. It turns out that determining appropriate due dates for this rule is a critical task. We provide a detailed analysis of the wafer fab behavior for a large range of due date values. From the results of the experiments we de...

متن کامل

Modeling, Scheduling, and Prediction in Wafer Fabrication Systems Using Queueing Petri Net and Genetic Algorithm

-Wafer fabrication is one of the most competitive manufacturing business in the world. In order to survive from such strongly competitive environment, finding an effective schedule which can result in higher machine utilization and throughput rate, shorter cycle time, and lower WIP (Work-In-Product) inventory becomes a major task. Besides that, in order to help customers to make ordering decisi...

متن کامل

The Shortest Processing Time First (sptf) Dispatch Rule and Some Variants in Semiconductor Manufacturing

Looking for appropriate dispatch rules for semiconductor fabrication facilities (wafer fabs), practitioners often intend to use the Shortest Processing Time First (SPTF) rule because it is said to reduce cycle times. In our study, we show, however, that this positive effect on cycle times can be achieved in single machine systems but not necessarily in complete wafer fabs. In addition, we discu...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2003