Sequencing Heuristics for Flexible Flow Shop Scheduling Problems with Unrelated Parallel Machines and Setup Times
نویسندگان
چکیده
This paper presents an investigation of scheduling procedures to seek the minimum of a positively weighted convex sum of makespan and the number of tardy jobs in a static flexible flow shop scheduling environment. The flexible flow shop problem is a scheduling of jobs in a flow shop environment consisting of series of production stages, some of which may have only one machine, but at least one stage must have multiple machines. In addition, sequence and machine dependent setup times are considered. No preemption of jobs is allowed. Some dispatching rules and flow shop makespan heuristics are adapted for sequencing in the flexible flow shop problem. The improvement heuristic algorithms such as shift and pairwise interchange algorithms have been proposed. Upon these heuristics, the first stage sequence is generated by using them. The first stage sequence will now be used, in conjunction with either permutation or FIFO rules, to construct a schedule for the problem. The solution is then set equal to the best function value obtained by both rules. The performance of the heuristics is compared relative to the optimal solution on a set of small-scale test problems.
منابع مشابه
A New Lower Bound for Flexible Flow Shop Problem with Unrelated Parallel Machines
Flexible flow shop scheduling problem (FFS) with unrelated parallel machines contains sequencing in flow shop where, at any stage, there exists one or more processors. The objective consists of minimizing the maximum completion time. Because of NP-completeness of FFS problem, it is necessary to use heuristics method to address problems of moderate to large scale problem. Therefore, for assessme...
متن کاملA comparison of algorithms for minimizing the sum of earliness and tardiness in hybrid flow-shop scheduling problem with unrelated parallel machines and sequence-dependent setup times
In this paper, the flow-shop scheduling problem with unrelated parallel machines at each stage as well as sequence-dependent setup times under minimization of the sum of earliness and tardiness are studied. The processing times, setup times and due-dates are known in advance. To solve the problem, we introduce a hybrid memetic algorithm as well as a particle swarm optimization algorithm combine...
متن کاملHeuristic approach to solve hybrid flow shop scheduling problem with unrelated parallel machines
In hybrid flow shop scheduling problem (HFS) with unrelated parallel machines, a set of n jobs are processed on k machines. A mixed integer linear programming (MILP) model for the HFS scheduling problems with unrelated parallel machines has been proposed to minimize the maximum completion time (makespan). Since the problem is shown to be NP-complete, it is necessary to use heuristic methods to ...
متن کاملFinite Horizon Economic Lot and Delivery Scheduling Problem: Flexible Flow Lines with Unrelated Parallel Machines and Sequence Dependent Setups
This paper considers the economic lot and delivery scheduling problem in a two-echelon supply chains, where a single supplier produces multiple components on a flexible flow line (FFL) and delivers them directly to an assembly facility (AF). The objective is to determine a cyclic schedule that minimizes the sum of transportation, setup and inventory holding costs per unit time without shortage....
متن کاملزمانبندی دو معیاره در محیط جریان کاری ترکیبی با ماشینهای غیر یکسان
This study considers scheduling in Hybrid flow shop environment with unrelated parallel machines for minimizing mean of job's tardiness and mean of job's completion times. This problem does not study in the literature, so far. Flexible flow shop environment is applicable in various industries such as wire and spring manufacturing, electronic industries and production lines. After modeling the p...
متن کامل