Dynamic Verifier Core: A Practical Solution to Mitigate the Risks of Software Risk Management Process

نویسندگان

  • Ahdieh Sadat Khatavakhotan
  • Siew Hock Ow
چکیده

Risk management is considered as a crucial activ ity in all types of software development processes. While risk management plans are proposed to control and mitigate the risks, they may face some risks too. According to the formal reports, the remarkable rate of failure in IT projects shows the relative unsuccessfulness in the risk management process. This indicates the necessity of improvements in the current risk management models. The authors of this research proposed a dynamic verifier core (DVC) committee for mitigating the risks of risk management of software projects. Th is important is done by identifying deviations and thereupon leads to performance improvement in risk management process. The model tries to identify and control the involved risks in risk management process. Using a communication system facilitates close relations between the prev ious ad current projects’ employees. This system also accelerates the instant awareness of the changes with the comprehensive classificat ion of risk factors and increases the efficiency of the model. In order to validate the model, the risks of a Customer Relat ionship Management (CRM) system of an industrial company have been managed. In the case study the related risk factors are successfully identified and classified. The results show the effectiveness and practicality of the model.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Fuzzy AHP-TOPSIS Framework for the Risk Assessment of Green Supply Chain Implementation in the Textile Industry

In the emerging supply chain environment, green supply chain risk management plays a significant role than ever. Risk is an inherent uncertainty and has tendency to disrupt the typical green supply chain management (GSCM) operations and eventually reduce the success rate of industries. In order to mitigate the consequences, a fuzzy multi-criteria group decision making modeling (FMCGDM) which co...

متن کامل

New Product Development Risk Assessment in the Core Banking Using FMEA Combined with COPRAS Method and Grey Relations

The present study tries to investigate the existing risks in the new product development process in the core banking field. Due to its use after production, new product development with the fewest errors and risks is always the subject of discussion and investigation among the researchers of this field. This study aims to investigate the most important risks existing in the new product developm...

متن کامل

A Fuzzy Decision-Making Methodology for Risk Response Planning in Large-Scale Projects

Risk response planning is one of the main phases in the project risk management and has major impacts on the success of a large-scale project. Since projects are unique, and risks are dynamic through the life of the projects, it is necessary to formulate responses of the important risks. The conventional approaches tend to be less effective in dealing with the impreciseness of risk response p...

متن کامل

Prioritization of Supply Chain Risks in Automotive Industry

Supply chains are constantly exposed to various risks. An incident or uncertain event, which has positive or negative effect on the objectives of a project, is called a risk. According to this identification, analysis and prioritization of risks may have a significant role in the success of the project. The purpose of risk management is to reduce the risks of non-achievement of these object...

متن کامل

Prioritization of Supply Chain Risks in Automotive Industry

Supply chains are constantly exposed to various risks. An incident or uncertain event, which has positive or negative effect on the objectives of a project, is called a risk. According to this identification, analysis and prioritization of risks may have a significant role in the success of the project. The purpose of risk management is to reduce the risks of non-achievement of these object...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2013