Industrial Voltage Optimization at Large Industrial Facility Brings Energy Savings

نویسندگان

  • Erin Hope
  • Jeremy Wilson
چکیده

Less is more when it comes to eating healthy and the same can be said of alternating current (AC) voltage inside industrial plants. By using active voltage regulation which incorporates voltage monitoring at the load, an industrial facility can save energy and better protect their equipment and systems. In the early spring of 2007, Plum Creek Timber Company (Plum Creek), Flathead Electric Cooperative (Flathead Electric), and the Bonneville Power Administration (BPA) teamed up with PCS UtiliData (PCS) to evaluate Plum Creek's Medium Density Fiberboard (MDF) facility in order to optimize its distribution voltage. Based on the November 2007 evaluation, the facility implemented the AdaptiVoltTM voltage optimization system resulting in a voltage reduction between 1.9% and 4.8%. This reduction provides over 6,000,000 kWh per year of energy savings. This paper will describe the results of the evaluation, commissioning, and the measurement and verification (M&V) of the AdaptiVoltTM system installed at the facility. It will also address some key factors that were discovered during the evaluation, resulting in a modification of the evaluation processes and extending the M&V period another 11 months. Some of the factors are the influence of the distribution system’s characteristics on energy savings (i.e., the effects of an unbalanced distribution system), the unique M&V techniques used to determine the system’s potential, and the various setbacks that nearly eliminated the energy savings produced by the project.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Integrated Approach for Facility Location and Supply Vessel Planning with Time Windows

This paper presents a new model of two-echelon periodic supply vessel planning problem with time windows mix of facility location (PSVPTWMFL-2E) in an offshore oil and gas industry. The new mixed-integer nonlinear programming (MINLP) modelconsists ofa fleet composition problem and a location-routing problem (LRP). The aim of the model is to determine the size and type of large vessels in the fi...

متن کامل

Incentive Design of Conservation Voltage Reduction Planning for Industrial Loads in Ontario

In this thesis, a novel framework for planning and investment studies pertaining to the implementation of system-wide conservation voltage reduction (CVR) is presented. In the CVR paradigm, optimal voltage profiles at the load buses are determined so as to yield load reductions and hence energy conservation. The system modifications required for CVR is known to be capital intensive; therefore, ...

متن کامل

A New Optimization via Invasive Weeds Algorithm for Dynamic Facility Layout Problem

The dynamic facility layout problem (DFLP) is the problem of finding positions of departments onthe plant floor for multiple periods (material flows between departments change during the planning horizon)such that departments do not overlap, and the sum of the material handling and rearrangement costs isminimized. In this paper a new optimization algorithm inspired from colonizing weeds, Invasi...

متن کامل

Power Consumption Characteristics of Industrial Air Compressors

Compressed air is typically one of the most expensive utilities in an industrial facility. As a result, potential savings opportunities are aggressively sought out and identified. Once identified, projected energy savings must be calculated in order to justify the cost of implementing the savings opportunity. It is important to calculate projected energy and cost savings as accurately as possib...

متن کامل

Real-time optimization of an active filter's performance

AbstructRecent advances in power electronics have meant that many loads now draw a distorted current from the power supply. For the same real power consumed, the apparent power for the distorted load is greater than the equivalent sinusoidal load. A real-time active filter optimization algorithm has been implemented in a TMS32OC30 DSP, with the aim of maximizing the monetary savings from active...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2011