Optimal allocation and processing time decisions on non-identical parallel CNC machines: epsilon-constraint approach

نویسندگان

  • Sinan Gürel
  • M. Selim Akturk
چکیده

When the processing times of jobs are controllable, selected processing times affect both the manufacturing cost and the scheduling performance. A well known example for such a case that this paper specifically deals with is the turning operation on a CNC machine. Manufacturing cost of a turning operation is a nonlinear convex function of its processing time. In this paper, we deal with making optimal machine-job assignments and processing time decisions so as to minimize total manufacturing cost while the makespan being upper bounded by a known value, denoted as -constraint approach for a bicriteria problem. We then give optimality properties for the resulting single criterion problem. We provide alternative methods to compute cost lower bounds for partial schedules, which are used in developing an exact (branch and bound) algorithm. For the cases where the exact algorithm is not efficient in terms of computation time, we present a recovering beam search algorithm equipped with an improvement search procedure. In order to find improving search directions, the improvement search algorithm uses the proposed cost bounding properties. Computational results show that our lower bounding methods in branch and bound algorithm achieve a significant reduction in the search tree size that we need to traverse. Also, our recovering beam search and improvement search heuristics achieve solutions within 1% of the optimum on the average while they spent much less computational effort than the exact algorithm. 2006 Elsevier B.V. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A bi-objective model for a scheduling problem of unrelated parallel batch processing machines with fuzzy parameters by two fuzzy multi-objective meta-heuristics

This paper considers a bi-objective model for a scheduling problem of unrelated parallel batch processing machines to minimize the makespan and maximum tardiness, simultaneously. Each job has a specific size and the data corresponding to its ready time, due date and processing time-dependent machine are uncertain and determined by trapezoidal fuzzy numbers. Each machine has a specific capacity,...

متن کامل

Solving a New Multi-objective Unrelated Parallel Machines Scheduling Problem by Hybrid Teaching-learning Based Optimization

This paper considers a scheduling problem of a set of independent jobs on unrelated parallel machines (UPMs) that minimizesthe maximum completion time (i.e., makespan or ), maximum earliness ( ), and maximum tardiness ( ) simultaneously. Jobs have non-identical due dates, sequence-dependent setup times and machine-dependentprocessing times. A multi-objective mixed-integer linear programmi...

متن کامل

Two meta-heuristic algorithms for parallel machines scheduling problem with past-sequence-dependent setup times and effects of deterioration and learning

This paper considers identical parallel machines scheduling problem with past-sequence-dependent setup times, deteriorating jobs and learning effects, in which the actual processing time of a job on each machine is given as a function of the processing times of the jobs already processed and its scheduled position on the corresponding machine. In addition, the setup time of a job on each machin...

متن کامل

A fixed and flexible maintenance operations planning optimization in a parallel batch machines manufacturing system

Scheduling has become an attractive area for artificial intelligence researchers. On other hand, in today's real-world manufacturing systems, the importance of an efficient maintenance schedule program cannot be ignored because it plays an important role in the success of manufacturing facilities. A maintenance program may be considered as the heath care of manufacturing machines and equipments...

متن کامل

Scheduling parallel CNC machines with time/cost trade-off considerations

When the processing times of jobs are controllable, selected processing times affect both themanufacturing cost and the scheduling performance.Awell-known example for such a case that this paper specifically deals with is the turning operation on a CNCmachine. Manufacturing cost of a turning operation is a nonlinear convex function of its processing time. We also know that scheduling decisions ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • European Journal of Operational Research

دوره 183  شماره 

صفحات  -

تاریخ انتشار 2007