Replacement times and costs in a degrading system with several types of failure: The case of phase-type holding times

نویسندگان

  • Delia Montoro-Cazorla
  • Rafael Pérez-Ocón
چکیده

A reliability system submitted to external and internal failures, that can be repairable or non-repairable, with degradation levels, and with sojourn times phase-type distributed, is considered. Repair is not as good as new, and the repair of internal failure follows policy N, that is, after N completed repairs the system is replaced by a new one to the following failure, repairable or not. For this system, a Markov model is constructed, and the stationary probability vector is calculated. It is shown that the distribution of the time between two consecutive replacements follows a phasetype distribution, whose representation is determined. The costs of these periods are calculated. An optimization problem involving the costs, the availability, and the number of internal repairs is illustrated by a numerical example. 2005 Elsevier B.V. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The optimal age-based replacement policy for systems subject to shocks

In this article, two different systems subject to shocks occurring based on a non-homogeneous Poisson process (NHPP) are analyzed. Type –I system is consisted of a single unit and type –II system is consisted of two parallel units in which both units operate identically and simultaneously. In type –I system occurrence of a shock causes system stopping and consequently will be received minimal r...

متن کامل

Planning in a cross dock network with an operational scheduling overview

Nowadays, cross docking plays an important role in the supply chain networks especially in transportation systems. According to the cross dock system advantages such as reducing transportation costs, lead times, and inventories, scheduling in a cross-dock center would be more complicated by increasing the number of suppliers, customers and product types. Considering the cross dock limited capac...

متن کامل

Maintenance Cost Analysis for Replacement Model with Perfect Minimal Repair

With the evolution of technology, the maintenance of sophisticated systems is of concern for system engineers and system designers. The maintenance cost of the system depends in general on the replacement and repair policies. The system replacement may be in a strictly periodic fashion or on a random basis depending upon the maintenance policy. At failure, the repair of the system may be perfor...

متن کامل

Design of a Hybrid Genetic Algorithm for Parallel Machines Scheduling to Minimize Job Tardiness and Machine Deteriorating Costs with Deteriorating Jobs in a Batched Delivery System

This paper studies the parallel machine scheduling problem subject to machine and job deterioration in a batched delivery system. By the machine deterioration effect, we mean that each machine deteriorates over time, at a different rate. Moreover, job processing times are increasing functions of their starting times and follow a simple linear deterioration. The objective functions are minimizin...

متن کامل

Simulation of tunnel boring machine utilization: A case study

Utilization is one of the main managerial factors that is applied for construction process analysis well. It directly affects the project duration and construction costs. Therefore, a utilization study in tunneling projects is essential. In this work, the utilization of an earth pressure balance Tunnel Boring Machine (TBM) in Tabriz urban railway project was studied using the Monte Carlo simula...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • European Journal of Operational Research

دوره 175  شماره 

صفحات  -

تاریخ انتشار 2006