A Message-Optimal Distributed Graph Algorithm: Partial Precedence Constrained Scheduling
نویسندگان
چکیده
This paper presents a distributed algorithm for the partial precedence constrained scheduling problem. In the classical precedence constrained scheduling problem all the dependent tasks must be scheduled before the task itself can be scheduled. The partial precedence constrained scheduling problem is a generalized version of the original precedence constrained problem in the sense that the number of dependent tasks to be scheduled before the task itself can be scheduled is considered a variable. Using a directed graph to model the partial precedence constrained scheduling problem in which n nodes represent the tasks and e edges represent the precedence constraints, it is shown that the distributed algorithm requires O(e) messages and O(n) units of time and is optimal in communication complexity to within a constant factor.
منابع مشابه
An improved genetic algorithm for multidimensional optimization of precedence-constrained production planning and scheduling
Integration of production planning and scheduling is a class of problems commonly found in manufacturing industry. This class of problems associated with precedence constraint has been previously modeled and optimized by the authors, in which, it requires a multidimensional optimization at the same time: what to make, how many to make, where to make and the order to make. It is a combinatorial,...
متن کاملA Cuckoo search algorithm (CSA) for Precedence Constrained Sequencing Problem (PCSP)
Precedence constrained sequencing problem (PCSP) is related to locate the optimal sequence with the shortest traveling time among all feasible sequences. In PCSP, precedence relations determine sequence of traveling between any two nodes. Various methods and algorithms for effectively solving the PCSP have been suggested. In this paper we propose a cuckoo search algorithm (CSA) for effectively ...
متن کاملProject Scheduling with Simultaneous Optimization, Time, Net Present Value, and Project Flexibility for Multimode Activities with Constrained Renewable Resources
Project success is assessed based on various criteria, every one of which enjoys a different level of importance for the beneficiaries and decision makers. Time and cost are the most important objectives and criteria for the project success. On the other hand, reducing the risk of finishing activities until the predetermined deadlines should be taken into account. Having formulated the problem ...
متن کاملMakespan Minimization of task graphs with random task running times
The problem of scheduling a set of tasks on two parallel and identical processors is considered. The executions of tasks are constrained by precedence relations. The running times of the tasks are independent random variables with a common exponential distribution. The goal of scheduling is to minimize the makespan, i.e. the maximum task completion time. A simple optimal preemptive policy is pr...
متن کاملA multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations
The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, t...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- J. UCS
دوره 10 شماره
صفحات -
تاریخ انتشار 2004