Archived Simulated Annealing for Unrelated Parallel Machine Scheduling to Minimize Fuzzy Makespan and Tardiness
نویسندگان
چکیده
The research proposes a two-phase matching-based decoding scheme that will be incorporated into bi-objective simulated annealing (SA) to solve unrelated parallel machine scheduling problems (UPMSP). The two objectives are to maximize the satisfactions of makespan and average tardiness, in terms of fuzzy measure. The effectiveness of the decoding scheme is investigated using four simulated annealing algorithms: acceptance probability rules based on fitness value difference and Pareto dominance, as well as solution search based on fixed weighted and random weighted directions. An experiment was conducted to evaluate the performance of the proposed eight SAs via instances generated by a method in the literature. The experiment results indicate that (1) two-phase decoding method that uses max-min matching first and Hungarian method second significantly improves proximity quality; (2) Pareto dominance rule probability and random weighted direction search produce solutions with better diversity.
منابع مشابه
A bi-objective model for a scheduling problem of unrelated parallel batch processing machines with fuzzy parameters by two fuzzy multi-objective meta-heuristics
This paper considers a bi-objective model for a scheduling problem of unrelated parallel batch processing machines to minimize the makespan and maximum tardiness, simultaneously. Each job has a specific size and the data corresponding to its ready time, due date and processing time-dependent machine are uncertain and determined by trapezoidal fuzzy numbers. Each machine has a specific capacity,...
متن کاملA Novel B and B Algorithm for a Unrelated Parallel Machine Scheduling Problem to Minimize the Total Weighted Tardiness
This paper presents a scheduling problem with unrelated parallel machines and sequencedependent setup times that minimizes the total weighted tardiness. A new branch-and-bound (B and B) algorithm is designed incorporating the lower and upper bounding schemes and several dominance properties. The lower and upper bounds are derived through an assignment problem and the composite dispatching rule ...
متن کاملA Heuristic Algorithm Approach for Scheduling of Multi-criteria Unrelated Parallel Machines
In this paper we address a multi-objective scheduling problem for unrelated parallel machines. In unrelated parallel systems, the processing cost/time of a given job on different machines may vary. The objective of scheduling is to simultaneously determine the job-machine assignment and job sequencing on each machine. In such a way the total cost of the schedule is minimized. The cost function ...
متن کاملHybrid artificial immune system and simulated annealing algorithms for solving hybrid JIT flow shop with parallel batches and machine eligibility
This research deals with a hybrid flow shop scheduling problem with parallel batching, machine eligibility, unrelated parallel machine, and different release dates to minimize the sum of the total weighted earliness and tardiness (ET) penalties. In parallel batching situation, it is supposed that number of machine in some stages are able to perform a certain number of jobs simultaneously. First...
متن کاملFuzzy Programming for Parallel Machines Scheduling: Minimizing Weighted Tardiness/Earliness and Flow Time through Genetic Algorithm
Appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager encounters; this is why in recent decades extensive studies have been done on scheduling issues. One type of scheduling problems is just-in-time (JIT) scheduling and in this area, motivated by JIT manufacturing, this study investigates a mathematical model for...
متن کامل