Superconducting Rf System for the Cesr Luminosity Upgrade: Design, Status, and Plans*
نویسندگان
چکیده
The CESR Luminosity Upgrade Plan consists of several consecutive steps, or phases [1]. At the present time, this program is in Phase II. The next step, Phase III, would yield a luminosity of 1x1033cm-2sec-1 with 45 bunches in each beam for a total current of 1 A. This plan utilizes four superconducting single-cell cavities with an accelerating gradient of 6 MV/m, which corresponds to a peak accelerating voltage of 1.8 MV per cell. The power transferred to the beam in each cavity would be 325 kW. Some machine and RF parameters are given in Table 1. The use of only four superconducting RF (SRF) cells with more strongly damped higher-order modes (HOMs), as compared to the present twenty normal conducting (NRF) copper cells, decreases both the broad band and narrow band impedances sufficiently to allow stable operation at the high current levels. The name BB1 has been assigned to the Cornell superconducting 500 MHz single-cell cavity shape. One can find a detailed description of the cavity elsewhere [2]. Two cavities have been manufactured to date: the first, BB1-1, by Dornier, and the second, BB1-2, by ACCEL. The BB1-1 cavity and prototype RF window, cryostat, HOM loads and beam line components were subjected to a beam test in CESR in August 1994 [3]. This experience allowed us to complete the design of the SRF system, which is described in this paper.
منابع مشابه
Superconducting Rf System Upgrade for Short Bunch Operation of Cesr*
The CESR luminosity upgrade plan calls for shortening bunch length to 1 cm. Such bunch length can be achieved by installing two more superconducting cavities to increase total RF voltage. The RF system upgrade necessary to accommodate this change is discussed.
متن کاملPerformance of the Cesr Superconducting Rf System and Future Plans*
As we have reported at the last SRF Workshop two years ago, staged transition of the Cornell Electron Storage Ring (CESR) RF System from normal conducting to superconducting was completed in September 1999 with installation of the fourth superconducting B-cell cavity [1]. Since that time the last cavity has been commissioned and RF system has operated stably providing CESR beams with up to 1.13...
متن کاملCesr Status and Plans
The CESR electron positron collider has been con gured to operate with trains of closely spaced bunches that collide with a small horizontal crossing angle. The crossing angle scenario provides for an increase from seven to as many as 45 bunches per beam. Two pairs of electrostatic separators yield di erential horizontal closed orbits for the electron and positron beams. The separators are powe...
متن کاملDevelopment of Superconducting Rf for Cesr*
After the successful CESR beam test of August 1994 the continued development of a superconducting RF system for the CESR Luminosity Upgrade is in progress at the Laboratory of Nuclear Studies, Cornell University. The system description as well as recent results are presented.
متن کاملCommissioning of the Superconducting Rf Cavities for the Cesr Luminosity Upgrade
The new superconducting RF system consisting of four single-cell cavity modules is an important part of the CESR Luminosity Upgrade. We describe the commissioning of the first three accelerating modules. This includes in situ testing and conditioning, pulsed power and beam processing of RF windows, commissioning of various cryogenic feedback loops, measuring cavity spacing and phasing with beam...
متن کامل