An algebraic approach to project schedule development under precedence constraints
نویسنده
چکیده
An approach to schedule development in project management is developed within the framework of idempotent algebra. The approach offers a way to represent precedence relationships among activities in projects as linear vector equations in terms of an idempotent semiring. As a result, many issues in project scheduling reduce to solving computational problems in the idempotent algebra setting, including linear equations and eigenvalue-eigenvector problems. The solutions to the problems are given in a compact vector form that provides the basis for the development of efficient computation procedures and related software applications. Keywords—Idempotent semiring, Linear equation, Eigenvalue, Eigenvector, Project scheduling, Precedence relations, Flow time
منابع مشابه
مساله زمانبندی پروژه با منابع محدود با هدف حداکثر نمودن ارزش خالص فعلی
Resource-constrained project scheduling problem (RCPSP) aims to schedule at minimal duration a set of activities subject to precedence constraints and the limited availability of resources. Considering net present value (NPV) is one of the modern approaches in scheduling projects in which the project is scheduled in such a way that NPV be maximized. This approach with deterministic parameters s...
متن کاملAlgebraic Solutions to Scheduling Problems in Project Management
An approach to schedule development in project management is proposed based on models and methods of idempotent algebra. The approach offers a way to represent various types of precedence relationships among activities in projects as linear vector equations in terms of an idempotent semiring. As a result, many issues in project scheduling reduce to solving computational problems in the idempote...
متن کاملA multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations
The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, t...
متن کاملAn Efficient Genetic Agorithm for Solving the Multi-Mode Resource-Constrained Project Scheduling Problem Based on Random Key Representation
In this paper, a new genetic algorithm (GA) is presented for solving the multi-mode resource-constrained project scheduling problem (MRCPSP) with minimization of project makespan as the objective subject to resource and precedence constraints. A random key and the related mode list (ML) representation scheme are used as encoding schemes and the multi-mode serial schedule generation scheme (MSSG...
متن کاملSINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT
In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- CoRR
دوره abs/1210.6508 شماره
صفحات -
تاریخ انتشار 2012