Robust Optimization Strategies for Total Cost Control in Project Management

نویسندگان

  • Joel Goh
  • Nicholas G. Hall
  • Melvyn Sim
چکیده

We describe robust optimization procedures for controlling total completion time penalty plus crashing cost in projects with uncertain activity times. These activity times arise from an unspecified distribution within a family of distributions with known support, mean and covariance. We develop linear and linear-based decision rules for making decisions about activity start times and the crashing of activity times. These rules identify decisions that perform well against all possible scenarios of activity time uncertainty. The resulting crashing strategies are implemented in both static and rolling horizon modes. Whereas the traditional planning methodology PERT does not consider correlation between past and future performance within or between activities, our methodology models both types of correlation. We compare our procedures against PERT, and also against the alternative approach of Monte Carlo simulation which assumes more information. Extensive computational results show that our crashing strategies provide over 99% probability of meeting the overall project budget, compared to less than 45% for the previous approaches that use the same information. Expected budget overruns are similarly improved from over 25% to less than 0.1%. The relative advantages of the static and rolling horizon implementations are also discussed. We identify several managerial insights from our results.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Fuzzy Multi-Objective Linear Programming for Project Management Decision under Uncertain Environment with AHP Based Weighted Average Method

Smooth implementation and controlling conflicting goals of a project with the usage of all related resources through organization is inherently a complex task to management. At the same time deterministic models are never efficient in practical project management (PM) decision problems because the related parameters are frequently fuzzy in nature. The project execution time is a major concern o...

متن کامل

Optimization of Time, Cost, and Quality in Critical Chain Method Using Simulated Annealing (RESEARCH NOTE)

In the last decade, theory of constraint application in project management lead to make a new approach for project scheduling and control as a critical chain. In this paper, a multi-objective optimization model for multi-project scheduling on critical chain is investigated. The objectives include time, cost and quality. In order to solve the problem, a Simulated Annealing algorithm is developed...

متن کامل

A Robust Scenario Based Approach in an Uncertain Condition Applied to Location-Allocation Distribution Centers Problem

The paper discusses the location-allocation model for logistic networks and distribution centers through considering uncertain parameters. In real-world cases, demands and transshipment costs change over the period of the time. This may lead to large cost deviation in total cost. Scenario based robust optimization approaches are proposed where occurrence probability of each scenario is not know...

متن کامل

Robust Optimization Approach for Design for a Dynamic Cell Formation Considering Labor Utilization: Bi-objective Mathematical Model

In this paper, robust optimization of a bi-objective mathematical model in a dynamic cell formation problem considering labor utilization with uncertain data is carried out. The robust approach is used to reduce the effects of fluctuations of the uncertain parameters with regards to all the possible future scenarios. In this research, cost parameters of the cell formation and demand fluctuation...

متن کامل

Developing Robust Project Scheduling Methods for Uncertain Parameters

A common problem arising in project management is the fact that the baseline schedule is often disrupted during the project execution because of uncertain parameters. As a result, project managers are often unable to meet the deadline time of the milestones. Robust project scheduling is an effective approach in case of uncertainty. Upon adopting this approach, schedules are protected against po...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2010