The stochastic economic lot scheduling problem: A survey
نویسندگان
چکیده
We consider the production of multiple standardized products on a single machine with limited capacity and set-up times under random demands and random production times, i.e., the so-called stochastic economic lot scheduling problem (SELSP). The main task for the production manager in this setting is the construction of a production plan for the machine that minimizes the total costs, i.e., the sum of holding, backlogging and set-up costs. Based on the critical elements of such a production plan, we give a classification and extensive overview of the research on the SELSP together with an indication of open research areas.
منابع مشابه
The Economic Lot Scheduling Problem in Flow Lines with Sequence-Dependent Setups
The problem of lot sizing, sequencing and scheduling multiple products in flow line production systems has been studied by several authors. Almost all of the researches in this area assumed that setup times and costs are sequence –independent even though sequence dependent setups are common in practice. In this paper we present a new mixed integer non linear program (MINLP) and a heuristic me...
متن کاملFinite Horizon Economic Lot and Delivery Scheduling Problem: Flexible Flow Lines with Unrelated Parallel Machines and Sequence Dependent Setups
This paper considers the economic lot and delivery scheduling problem in a two-echelon supply chains, where a single supplier produces multiple components on a flexible flow line (FFL) and delivers them directly to an assembly facility (AF). The objective is to determine a cyclic schedule that minimizes the sum of transportation, setup and inventory holding costs per unit time without shortage....
متن کاملThe Finite Horizon Economic Lot Scheduling in Flexible Flow Lines
This paper addresses the common cycle multi-product lot-scheduling problem in flexible flow lines (FFL) where the product demands are deterministic and constant over a finite planning horizon. Objective is minimizing the sum of setup costs, work-in-process and final products inventory holding costs per time unite while satisfying the demands without backlogging. This problem consists of a combi...
متن کاملA Basic Period Approach for Solving the Economic Lot and Delivery Scheduling in Flexible Flow Lines
In this paper, the problem of lot sizing, scheduling and delivery of several items in a two-stage supply chain over a finite planning horizon is studied. Single supplier via a flexible flow line production system (FFL), produces several items and delivers them directly to an assembly facility. Based on basic period (BP) strategy, a new mixed zero-one nonlinear programming model has been develop...
متن کاملStochastic Optimal Scheduling of Microgrids Considering Demand Response and Commercial Parking Lot by AUGMECON Method
Regarding the advances in technology and anxieties around high and growing prices of fossil fuels, government incentives increase to produce cleaner and sustainable energy through distributed generations. This makes trends in the using microgrids which consist of electric demands and different distributed generations and energy storage systems. The optimum operation of microgrids with consideri...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- European Journal of Operational Research
دوره 210 شماره
صفحات -
تاریخ انتشار 2011