Completion of a 1,120-MVA Turbine Generator for Huadian International Zouxian Power Plant in China

نویسندگان

  • Seijiro Muramatsu
  • Kado Miyakawa
  • Mitsuru Onoda
  • Kazuhiko Takahashi
  • Kengo Iwashige
چکیده

INTRODUCTION THERE has been a trend in recent years toward larger capacity turbine generators. Larger output systems draw worldwide interest, and from the standpoint of efficient use of resources, expectations are particularly focused on large-capacity 2-pole generators for coalfired power plants. Hitachi has been in the forefront of efforts to develop better large-output 2-pole generators to meet these needs, and recently delivered a 1,025-MVA 60-Hz generator to a power plant in the U.S. in 2005(1),(2). This was Hitachi’s first 1,000-MVAclass installation of a 2-pole type generator, and extensive factory and onsite testing at the plant has proven the generator’s performance and reliability. OVERVIEW: Hitachi, Ltd. has completed construction of a 1,120-MVA turbine generator (2 poles, 50 Hz) for the Huadian International Zouxian Power Plant of China Huadian Corporation in China, and its performance has been fully verified through factory testing. With a maximum output of 1,230 MVA — some 1.6 times greater capacity than the 778-MVA output of Hitachi’s next larger similar generator — the generator is one of the world’s largest-class single unit turbine generators ever developed for a thermal power plant. This substantial increase in output could only be achieved through a combination of sophisticated technologies, including an advanced hydrogen gas and distilled water cooling system and 27-kV high-voltage insulation. Every effort was made to enhance the performance and reliability of the generator by fully exploiting advanced analytical procedures and tests including rotor vibration analysis, stator core end electromagnetic analysis, network ventilation analysis, and stress analysis of all key parts of the generator. Fullscale rotational tests including efficiency, temperature increases, shaft vibration, and other performance measures confirm that the 1,120-MVA turbine generator more than satisfies all design specifications.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

4E analysis and multi-objective optimization of gas turbine CCHP plant with variable ambient temperature

In this paper a gas turbine power plant including air preheater (recuperator), heat recovery steam generator and air cooler system was modeled. Eight parameters were selected as the design variables.  Fast and elitist non-dominated sorting genetic algorithm (NSGA-II) was applied (to maximize the exergy efficiency and to minimize the total cost rate) for the mentioned cogeneration system. Th...

متن کامل

Various Approaches to Thermodynamic Optimization of a Hybrid Multi-effect Evaporation with Thermal Vapour Compression and Reverse Osmosis Desalination System Integrated to a Gas Turbine Power Plant

This paper investigates the simulation of a hybrid desalination system composed of multi-effect evaporation with thermal vapour compression desalination (METVC) and reverse osmosis (RO) plant. The hybrid desalination system is also integrated with a gas turbine power plant through a heat recovery steam generator (HRSG). First, a comprehensive Thermodynamic model for HRSG, METVC, and RO are deve...

متن کامل

A Combined Vector and Direct Power Control for AC/DC/AC Converters in DFIG Based Wind Turbine

The doubly-fed generators (DFIG) have clear superiority for the applications of large capacity and limited-range speed control case due to the partially rated inverter, lower cost and high reliability. These characteristics enable the doubly-fed wound rotor induction machine to have vast applications in wind-driven generation.In this paper Combined Vector and direct power control (CVDPC) strate...

متن کامل

Thermodynamic and Exergy Analysis of a Combined Power and Desalination Plant

Making potable water through desalination plants is a very important process in Iran where clean water is highly required. On the other hand, large amount of fossil fuel sources leads to the development of gas turbine power plants all over the country. Furthermore, Persian Gulf in the south and Caspian Sea in the north could be the main sources for supplying potable water in water scarcity area...

متن کامل

Failure Mode and Effect Analysis Power Plant Boiler

The current electricity demand is increasing, and now the government has involved third parties in the implementation of electricity so that investors compete in building infrastructure in order to apply electricity. Thermal power is one source that has a fast break event point compared to other resources that more interested investors even with all forms of pollution caused. A form of heat pow...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2007