Duty-period-based network model for crew rescheduling in European airlines
نویسندگان
چکیده
Airline rescheduling is a relatively new field in airline Operations Research but increasing amounts of traffic will make disturbances to the original schedule more frequent and more severe. Thus, the need to address the various problems arising from this situation with systematic, cost-efficient approaches is becoming more urgent. One such problem is crew rescheduling where after a disturbance in the crew schedule the aim is to determine new crew assignments that minimize the ‘impact’ on the original schedule. In this work we present a new duty-period-based formulation for the airline crew rescheduling problem that is tailored to the needs of European airlines. It uses a new type of resource constraints to efficiently cover the various labor regulations. A solution method based on branch-and-price is tested on various rescheduling scenarios, each with several distinct cases. Results show that the solution method is capable of providing solutions within the short period of time available to a rescheduler after a disturbance occurs.
منابع مشابه
Real-time train driver rescheduling by actor-agent techniques
Passenger railway operations are based on an extensive planning process for generating the timetable, the rolling stock circulation, and the crew duties for train drivers and conductors. In particular, crew scheduling is a complex process. After the planning process has been completed, the plans are carried out in the real-time operations. Preferably, the plans are carried out as scheduled. How...
متن کاملDeveloping the Job Stress Model for Airlines Flight crew
Job is one of the most important issues in the discussion of human resources, and since the discussion of job stress in the flight crew and its relationship with the performance of the flight crew is very important and vital. This research is about recognizing and developing a model for job stress among the cabin crew of Mahan Airline. The qualitative research methodology has been followed by q...
متن کاملA two stage heuristic algorithm for the integrated aircraft and crew schedule recovery problems
Airline disruptions incurred huge cost for airlines and serious inconvenience for travelers. In this paper, we study the integrated aircraft and crew schedule recovery problem. A two stage heuristic algorithm for the integrated recovery problem is proposed. In the first stage, the integrated aircraft recovery and flight-rescheduling model with partial crew consideration is built. This model is ...
متن کاملThe value of runway time slots for airlines
Publications in the working paper series are issued for discussion and are not considered final reports. Comments are invited. In flight scheduling, airlines usually determine optimal timing for their flights to respond to time-dependent demand and the requirement of frequency plans, of available fleets and of aircraft routings. Nevertheless, it is unavoidable that some flights cannot actually ...
متن کاملRailway Crew Rescheduling with Retiming
Railway operations are disrupted frequently, e.g. the Dutch railway network experiences about three large disruptions per day on average. In such a disrupted situation railway operators need to quickly adjust their resource schedules. Nowadays, the timetable, the rolling stock and the crew schedule are recovered in a sequential way. In this paper, we model and solve the crew rescheduling proble...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- J. Scheduling
دوره 9 شماره
صفحات -
تاریخ انتشار 2006