An enumeration algorithm for the max-npv problem with linear time-dependent cash flows
نویسنده
چکیده
We study the unconstrained project scheduling problem with discounted cash flows where the net cash flows are assumed to be linear dependent on the completion times of the corresponding activities. The objective is to schedule the activities in order to maximize the net present value (npv) subject to the precedence constraints and a fixed deadline. We present an efficient enumeration algorithm which solves the problem in a reasonable time. In order to illustrate the efficiency of the algorithm, we validate it on a randomly generated problem set.
منابع مشابه
Net Present Value of Cash Flows in Single Machine and Flow Shop Scheduling Problems
While a great portion of the scheduling literature focuses on time-based criteria, the most important goal of management is maximizing the profitability of the firm. In this paper, the net preset value criterion is studied taking account of linear time-dependent cash flows in single machine and flow shop scheduling problems. First, a heuristic method is presented for the single machine scheduli...
متن کاملNet Present Value of Cash Flows in Single Machine and Flow Shop Scheduling Problems
While a great portion of the scheduling literature focuses on time-based criteria, the most important goal of management is maximizing the profitability of the firm. In this paper, the net preset value criterion is studied taking account of linear time-dependent cash flows in single machine and flow shop scheduling problems. First, a heuristic method is presented for the single machine scheduli...
متن کاملA New Bi-Objective Model for a Multi-Mode Resource-Constrained Project Scheduling Problem with Discounted Cash Flows and four Payment Models
The aim of a multi-mode resource-constrained project scheduling problem (MRCPSP) is to assign resource(s) with the restricted capacity to an execution mode of activities by considering relationship constraints, to achieve pre-determined objective(s). These goals vary with managers or decision makers of any organization who should determine suitable objective(s) considering organization strategi...
متن کاملROBUST RESOURCE-CONSTRAINED PROJECT SCHEDULING WITH UNCERTAIN-BUT-BOUNDED ACTIVITY DURATIONS AND CASH FLOWS I. A NEW SAMPLING-BASED HYBRID PRIMARY-SECONDARY CRITERIA APPROACH
This paper, we presents a new primary-secondary-criteria scheduling model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations (UD) and cash flows (UC). The RCPSP-UD-UC approach producing a “robust” resource-feasible schedule immunized against uncertainties in the activity durations and which is on the sampling-based scenarios may be evaluated from a cos...
متن کاملA Heuristic Algorithm for Project Scheduling Problem to Maximizing the Net Present Value
This paper deals with resource unconstrained project scheduling problems with the objective of maximizing the net present value (NPV) of project cash flows. Here we present a heuristic algorithm named as differential procedure (Dif_AOA).
In order to evaluate the efficiency of this algorithm, networks with node numbers between 10-1000 and network complexity coefficients between 1.3-6.6 have ...
متن کامل