16 . 322 - Stochastic Estimation and Control Final Project Massachusetts Institute of Technology Fall 2012

نویسنده

  • Pedro Santana
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Estimation of Evaporation over the Upper Blue Nile basin by combining Observations from Satellites and River flow Gauges

Mariam M. Allam Ralph M. Parsons Laboratory, Massachusetts Institute of Technology, Cambridge, Massachusetts Anjuli Jain Figueroa Ralph M. Parsons Laboratory, Massachusetts Institute of Technology, Cambridge, Massachusetts Dennis B. McLaughlin Ralph M. Parsons Laboratory, Massachusetts Institute of Technology, Cambridge, Massachusetts Elfatih A. B. Eltahir Ralph M. Parsons Laboratory, Massac...

متن کامل

Estimation and calibration algorithms for distributed sampling systems

Distributed Sampling Systems by Vijay Divi S.B., Massachusetts Institute of Technology (2002) S.B., Massachusetts Institute of Technology (2003) M.Eng., Massachusetts Institute of Technology (2004) Submitted to the Department of Electrical Engineering and Computer Science in partial fulfillment of the requirements for the degree of Doctor of Philosophy in Electrical Engineering and Computer Sci...

متن کامل

Bioinspired design of functionalised graphene

Zhao Qin and Markus Buehler* Laboratory for Atomistic and Molecular Mechanics (LAMM), Department of Civil and Environmental Engineering, Massachusetts Institute of Technology, 77 Massachusetts Avenue, Cambridge, MA 02139, USA; Center for Computational Engineering, Massachusetts Institute of Technology, 77 Massachusetts Avenue, Cambridge, MA 02139, USA; Center for Materials Science and Engineeri...

متن کامل

A stochastic model for project selection and scheduling problem

Resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. In this study, budget, investment costs and earnings are considered to be stochastic. The objectives are maximizing net present values of selected projects and minimizing v...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2012