Power Constrained Preemptive TAM Scheduling
نویسندگان
چکیده
1 We integrate scan-chain partitioning and preemptive test access mechanism (TAM) scheduling for core-based systems under power constraint. We also outline a flexible power conscious test wrapper to increase the flexibility in the scheduling process by (1) allowing several different bandwidths at cores and (2) controlling the cores test power consumption, which makes it possible to increase the test clock. We model the scheduling problem as a Bin-packing problem and we discuss the transformations: (1) TAM-time and (2) power-time and the possibilities to achieve an optimal solution and the limitations. We have implemented our proposed preemptive TAM scheduling algorithm and through experiments we demonstrate its efficiency.
منابع مشابه
The preemptive resource-constrained project scheduling problem subject to due dates and preemption penalties: An integer programming approach
Extensive research has been devoted to resource constrained project scheduling problem. However, little attention has been paid to problems where a certain time penalty must be incurred if activity preemption is allowed. In this paper, we consider the project scheduling problem of minimizing the total cost subject to resource constraints, earliness-tardiness penalties and preemption penalties, ...
متن کاملA Reconfigurable Power-Conscious Core Wrapper and its Application to SOC Test Scheduling
This paper presents a novel reconfigurable powerconscious core test wrapper and discusses its application to optimal power-constrained SOC (system-on-chip) test scheduling. The advantage with the proposed wrapper is that at each core it allows (1) a flexible TAM (test access mechanism) bandwidths, and (2) a possibility to select the appropriate test power consumption. Our scheduling technique, ...
متن کاملAn Optimization via Simulation approach for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problems
In this paper a novel modelling and solving method has been developed to address the so-called resource constrained project scheduling problem (RCPSP) where project tasks have multiple modes and also the preemption of activities are allowed. To solve this NP-hard problem, a new general optimization via simulation (OvS) approach has been developed which is the main contribution of the current re...
متن کاملUncertain Resource Availabilities: Proactive and Reactive Procedures for Preemptive Resource Constrained project Scheduling Problem
Project scheduling is the part of project management that deals with determining when intime to start (and finish) which activities and with the allocation of scarce resources to theproject activities. In practice, virtually all project managers are confronted with resourcescarceness. In such cases, the Resource-Constrained Project Scheduling Problem (RCPSP)arises. This optimization problem has...
متن کاملOptimizing a bi-objective preemptive multi-mode resource constrained project scheduling problem: NSGA-II and MOICA algorithms
The aim of a multi-mode resource-constrained project scheduling problem (MRCPSP) is to assign resource(s) with the restricted capacity to an execution mode of activities by considering relationship constraints, to achieve pre-determined objective(s). These goals vary with managers or decision makers of any organization who should determine suitable objective(s) considering organization strategi...