Earliness/tardiness scheduling with a common due date and family setups

نویسندگان

  • Rasika H. Suriyaarachchi
  • Andrew Wirth
چکیده

We examine the problem of scheduling jobs, on a single processor to minimise the total earliness and tardiness costs about a common due date. Jobs belong to mutually exclusive families and a sequence independent setup task is required when processing switches from a job of one family to a job of another. We extend earlier results to obtain necessary optimal conditions for this problem. These are then used to generate a fast heuristic. Its performance is compared with a lower bound, a greedy heuristic, a genetic algorithm and for small problems, the optimal solution.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Single Machine Common Due Date with Job Dependent Earliness and Tardiness Penalties Problem Using Neural Network

We consider the problem of scheduling of n jobs to minimize the total earliness and tardiness penalty. The scheduling objective is to minimize the sum of job dependent earliness and tardiness penalties.. After determining the scheduling for single machine common due date, using neural network, the result shows that the neural network solution performs very well.

متن کامل

Heuristic Approaches to a Common Due Date Earliness-tardiness Scheduling Problem

In this paper we compare simulated annealing and tabu search approaches to a single machine common due date assignment and scheduling problem with jobs available at different times. The objective is to minimize the total weighted sum of earliness, tardiness and due date costs.

متن کامل

Minimizing Earliness and Tardiness Penalties in a Single Machine Scheduling Against Common Due Date using Genetic Algorithm

Scheduling problems involving both earliness and tardiness costs became more important in recent years. This kind of problems include both earliness and tardiness penalties and tries to reduce them. In this study a case study from real world is investigated. Since the machine is bottle neck in the production line and all jobs have a common restrictive due date and different earliness and tardin...

متن کامل

The complexity of scheduling job families about a common due date

Family scheduling problems are characterized by a setup time structure where setups are only required between jobs from different families. We consider the problem of scheduling job families on parallel machines to minimize weighted deviation about a common due date. Various special cases of this problem have been considered in the literature. This note summarizes known complexity results and i...

متن کامل

Electromagnetism-like algorithm for fuzzy flow shop batch processing machines scheduling to minimize total weighted earliness and ‎tardiness‎

‎In this paper, we study a flow shop batch processing machines scheduling problem. The fuzzy due dates are considered to make the problem more close to the reality. The objective function is taken as the weighted sum of fuzzy earliness and fuzzy tardiness. In order to tackle the given problem, we propose a hybrid electromagnetism-like (EM) algorithm, in which the EM is hybridized with a diversi...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Computers & Industrial Engineering

دوره 47  شماره 

صفحات  -

تاریخ انتشار 2004