Integration of WBNM into A Continuous Simulation System for Design Flood Estimation

نویسنده

  • O. P. Droop
چکیده

The main approach to design flood estimation in Australia is event-based with the use of flood hydrograph models such as RORB, WBNM and URBS the most common practice for estimating design floods via rainfall based approaches. A characteristic of these models is that the routing of rainfall excess is distributed within the catchment, the amount of routing depending on the amount of sub-division of the catchment. Continuous simulation of losses is now established as an alternative to event-based design. The Continuous Simulation System for Design Flood Estimation (CSS) is currently the main continuous simulation system in use in. The CSS uses the WBMOD flood hydrograph model which routes rainfall excess at a concentrated storage at the outlet of the catchment instead of distributed through the catchment. This paper describes a comparison of the different methods of runoff routing when used in a continuous simulation system. Using the same data and loss system calibration used in a benchmark study for the CSS, the WBMOD was replaced with the Watershed Bounded Network Model (WBNM) and the benchmarking study was repeated. The results show comparisons of the two runoff routing models as well as comparisons of design flood estimates by flood frequency analysis, conventional event-based methods, and by the two routing models. Overall, calibration results for the CSS/WBNM were of a similar accuracy as for the original CSS/WBMOD with calibration of a single parameter (lag k) and simulation via a more realistic routing of flows through catchment subdivision based on drainage patterns. The most obvious differences between systems were the timing of flows and consistently lower design flood estimates for the CSS/WBMN.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Estimation of Design Floods Using Continuous Simulation

A common problem encountered by catchment managers is the estimation of design peak flow quantiles. Current practice, as discussed by Pilgrim (1987), is based either on the use of statistical approaches such as an at-site flood frequency analysis, or the use of a catchment modelling system to simulate catchment response to design rainfall. For many practical problems, the option of an at-site f...

متن کامل

Flood Hydrograph Estimation Using Watershed Bounded Network Model

Storage routing models are becoming more widely accepted for flood hydrograph synthesis. The network models represent a considerable advance in this direction even though these models are based on many assumptions and empirical relationships. Watershed Bounded Network Model (WBNM) is one such model. This model maintains a good relationship between the hydrological and geomorphological propertie...

متن کامل

Providing a Model for Cost Estimation of Hospital Information System Software Design Using Continuous Decision Tree Algorithm

Introduction: The cost estimation of a hospital information system software refers to estimating the cost and time required to develop the hospital information system software prior to the start of the project, which will continue until the end of production and development of the system. Estimating the cost of software to produce hospital information system is one of the major concerns of proj...

متن کامل

Providing a Model for Cost Estimation of Hospital Information System Software Design Using Continuous Decision Tree Algorithm

Introduction: The cost estimation of a hospital information system software refers to estimating the cost and time required to develop the hospital information system software prior to the start of the project, which will continue until the end of production and development of the system. Estimating the cost of software to produce hospital information system is one of the major concerns of proj...

متن کامل

Calibration of a Daily Rainfall-Runoff Model to Estimate High Daily Flows

Flood estimation can be performed on the basis of event-based simulation or continuous simulation. A model with continuous water balance accounting has the attractive feature that dynamic factors affecting runoff production may be represented explicitly (Lamb 1999). In particular, a conceptual rainfall-runoff model can simulate the changing antecedent moisture conditions that determine the catc...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2003