Production Planning and Control in Flow Shop Operations using Drum Buffer Rope Methodology: A System Dynamics Approach

نویسندگان

  • Alexandra Politou
  • Patroklos Georgiadis
چکیده

This paper aims to introduce System Dynamics (SD) in applying Drum Buffer Rope (DBR) methodology of Theory of Constraints (TOC) in a three-stage flow shop system that produces a single product. To the best of our knowledge, although there are a lot of TOC applications using discrete simulation in production scheduling with DBR methodology, there are not any TOC application of DBR methodology in production scheduling using System Dynamics.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Improving for Drum_Buffer_Rope material flow management with attention to second bottlenecks and free goods in a job shop environment

Drum–Buffer–Rope is a theory of constraints production planning methodology that operates by developing a schedule for the system’s first bottleneck. The first bottleneck is the bottleneck with the highest utilization. In the theory of constraints, any job that is not processed at the first bottleneck is referred to as a free good. Free goods do not use capacity at the first bottleneck, so very...

متن کامل

Dynamic Drum-Buffer-Rope approach for production planning and control in capacitated flow-shop manufacturing systems

Drum-Buffer-Rope-based production planning and control (PPC) approaches provide production managers with effective tools to manage production disruptions and improve operational performance. The corner stone of these approaches is the proper selection of time-buffers which are considered as exogenously defined constant. However, the majority of real-world manufacturing systems are characterized...

متن کامل

APPLICATION OF THEORY OF CONSTRAINTS ON SCHEDULING OF DRUM-BUFFER-ROPE SYSTEM S.S.Mahapatra

The successful enterprises deliver products and services in shorter throughput time and turnover inventory as quickly as possible. Three important approaches to achieve these goals are Materials Requirements Planning (MRPI, MRPII), Just-in-Time (JIT), and Theory of Constraints (TOC). TOC seems to be a viable proposition because it does not require costly affair of system change; rather it is si...

متن کامل

Using simplified drum-buffer-rope for re-entrant flow shop scheduling in a random environment

The traditional simplified drum buffer rope (SDBR) does not consider the application of re-entrant flow shop (RFS) in a random environment which might involve variable processing times and machine breakdowns. This paper proposed a weighted layer production buffer and weighted production buffer to monitor the status of the buffer deviation when applying SDBR in a RFS with non-deterministic param...

متن کامل

A Multi-Objective Optimization Approach Using Genetic Algorithms for Quick Response to Effects of Variability in Flow Manufacturing

This paper exemplifies a framework for development of multi-objective genetic algorithm based job sequencing method by taking account of multiple resource constraints. Along this, Theory of Constraints based Drum-Buffer-Rope methodology has been combined with genetic algorithm to exploit the system constraints. This paper introduces the Drum-Buffer-Rope to exploit the system constraints, which ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2008