WLM Goal Mode Using A Quickstart Service Policy
نویسنده
چکیده
1. Changed the STC classification rules to use a default of STCLO instead of SYSSTC by using the SPM rules. 2. Added a new service class, NEWWORKV, for new work that requires a velocity goal instead of a response goal. Changed some new workloads to use NEWWORKV instead of NEWWORK. 3. Updated the description of CICS and IMS subsystems to recommend using response time goals initially. 4. Assigned transaction versus region management for production online systems, but still retained region management for test and older online systems. 5. Turned on I/O Priority Management. 6. Set the Dynamic Alias Management service option to NO (the default). 7. Added the PRDBATMD service class. 8. Changed some velocities (PRDBATHI) so that a velocity of 30% wouldn't let discretionary work run above them. 9. Added new workloads for MQSeries (MQ), NetView (NETV), Oracle (ODSI), SAP R/3 (SAP) and CB. 10. Changed all report class names to begin with 'R'. Added report classes to every service class. 11. Changed service class names ONLPRDLO and ONLPRDHI to TRANLO and TRANHI. There was too much similarity to the region managed service classes of ONLPRD and ONLTST, causing confusion. Added classification groups for these. 12. Added description fields to classification rules and groups. 13. Revised the contents of many of the classification groups. 14. Updated some of the text to provide a more thorough explanation. Added additional references to the bibliography and throughout the document.
منابع مشابه
The Dimensions of Service - Exploring WLM's Solution Space
The behavior of a WLM-managed MVS system is sometimes best understood by looking at the goals rather than the workloads. A WLM goal occupies a space of many dimensions. The system administrator is free to burden the goal with an assortment of workloads, assign it a high or low importance, and set it a target that is somewhere between lenient and stringent. In execution, the goal may be met well...
متن کاملHybrid cooling with cycle steering in the IBM eServer z990
This product update forwards updates to both software and documentation. The software update is Release 18.2 of CPExpert. The release number indicates that it is the second release of 2008. provide updated documentation on CD; and (4) correct errors that have been reported. • Support z/OS Version 1 Release 10 (z/OS V1R10). z/OS V1R10 was made Generally Available (GA) by IBM in September 2008. S...
متن کاملThe NULevel trial of a scalable, technology-assisted weight loss maintenance intervention for obese adults after clinically significant weight loss: study protocol for a randomised controlled trial
BACKGROUND Effective weight loss interventions are widely available but, after weight loss, most individuals regain weight. This article describes the protocol for the NULevel trial evaluating the effectiveness and cost-effectiveness of a systematically developed, inexpensive, scalable, technology-assisted, behavioural intervention for weight loss maintenance (WLM) in obese adults after initial...
متن کاملA procedure for Web Service Selection Using WS-Policy Semantic Matching
In general, Policy-based approaches play an important role in the management of web services, for instance, in the choice of semantic web service and quality of services (QoS) in particular. The present research work illustrates a procedure for the web service selection among functionality similar web services based on WS-Policy semantic matching. In this study, the procedure of WS-Policy publi...
متن کاملLink Layer Enhancements for TCP/IP over GSM
This paper has two main contributions. First the extremely high latency of the GSM link is revealed which through measurements is determined to have a magnitude usually only known from satellite links. This greatly impacts the link configuration time of packet framing protocols for serial links like the Point-to-Point Protocol (PPP). The key idea of the proposed solution Quickstart-PPP is to br...
متن کامل