A Comparison of Workload Traces from Two Production Parallel Machines
نویسندگان
چکیده
The analysis of workload traces from real production parallel machines can aid a wide variety of parallel processing research, providing a realistic basis for experimentation in the management of resources over an entire workload. We analyze a ve-month workload trace of an Intel Paragon machine supporting a production parallel workload at the San Diego Supercomputer Center (SDSC), comparing and contrasting it with a similar workload study of an Intel iPSC/860 machine at NASA Ames NAS. Our analysis of workload characteristics takes into account the job scheduling policies of the sites and focuses on characteristics such as job size distribution (job parallelism), resource usage, runtimes, submission patterns, and wait times. Despite fundamental diierences in the two machines and their respective usage environments, we observe a number of interesting similarities with respect to job size distribution, system utilization, runtime distribution, and interarrival time distribution. We hope to gain insight into the potential use of workload traces for evaluating resource management polices at supercomputing sites and for providing both real-world job streams and accurate stochastic workload models for use in simulation analysis of resource management policies.
منابع مشابه
Solving the Problem of Scheduling Unrelated Parallel Machines with Limited Access to Jobs
Nowadays, by successful application of on time production concept in other concepts like production management and storage, the need to complete the processing of jobs in their delivery time is considered a key issue in industrial environments. Unrelated parallel machines scheduling is a general mood of classic problems of parallel machines. In some of the applications of unrelated parallel mac...
متن کاملSolving the Problem of Scheduling Unrelated Parallel Machines with Limited Access to Jobs
Nowadays, by successful application of on time production concept in other concepts like production management and storage, the need to complete the processing of jobs in their delivery time is considered a key issue in industrial environments. Unrelated parallel machines scheduling is a general mood of classic problems of parallel machines. In some of the applications of unrelated parallel mac...
متن کاملModeling User Runtime Estimates
User estimates of job runtimes have emerged as an important component of the workload on parallel machines, and can have a significant impact on how a scheduler treats different jobs, and thus on overall performance. It is therefore highly desirable to have a good model of the relationship between parallel jobs and their associated estimates. We construct such a model based on a detailed analys...
متن کاملA bi-objective model for a scheduling problem of unrelated parallel batch processing machines with fuzzy parameters by two fuzzy multi-objective meta-heuristics
This paper considers a bi-objective model for a scheduling problem of unrelated parallel batch processing machines to minimize the makespan and maximum tardiness, simultaneously. Each job has a specific size and the data corresponding to its ready time, due date and processing time-dependent machine are uncertain and determined by trapezoidal fuzzy numbers. Each machine has a specific capacity,...
متن کاملDynamic cellular manufacturing system considering machine failure and workload balance
Machines are a key element in the production system and their failure causes irreparable effects in terms of cost and time. In this paper, a new multi-objective mathematical model for dynamic cellular manufacturing system (DCMS) is provided with consideration of machine reliability and alternative process routes. In this dynamic model, we attempt to resolve the problem of integrated family (par...
متن کامل