A Monte Carlo simulation to validate the EAR cut-point method for assessing the prevalence of nutrient inadequacy at the population level.

نویسندگان

  • B de Lauzon
  • J L Volatier
  • A Martin
چکیده

OBJECTIVE The aim of this study was to validate the EAR cut-point method for assessing the prevalence of nutrient inadequacy at the population level. DESIGN AND SUBJECTS Different methods for estimating the prevalence of inadequate intake were compared: the cut-off point method, with cut-off points at the Recommended Dietary Allowance (RDA), 0.66 RDA, 0.50 RDA and the Estimated Average Requirement (EAR); the probability approach; and a Monte Carlo simulation. In total, 591 men and 674 women, aged 20-55 years, were included in the analyses. RESULTS The prevalence of inadequate intake as estimated by the EAR cut-point method was similar to the prevalence of inadequacy estimated by both probabilistic methods. The cut-point method with RDA, 0.66 RDA and 0.50 RDA as cut-off limits induced an over- or an underestimation of the real prevalence of inadequacy. CONCLUSIONS Probabilistic methods consider both the intake variability and the requirement variability, and, as a result, their estimation should be closer to the real prevalence of inadequacy. The use of the EAR cut-point method yields a good estimation of the prevalence of inadequate intake, comparable to the probability approach, and limits over- and underestimation of the prevalence induced by other cut-off points.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Population dynamic of Acipenser persicus by Monte Carlo simulation model and Bootstrap method in the southern Caspian Sea (Case study: Guilan province)

In this study population dynamic of Acipenser persicus with age structure model by Monte Carlo and Bootstrap approach was studied. Length frequency data a total of 4376 specimens collected from beach seine, fixed gill net and conservation force in coastal Guilan province during 2002 to 2012. Data imported to FiSAT II for length frequency analyze by ELEFAN 1. K, L∞ and t0 estimated 203, 0.08 and...

متن کامل

Applying Point Estimation and Monte Carlo Simulation Methods in Solving Probabilistic Optimal Power Flow Considering Renewable Energy Uncertainties

The increasing penetration of renewable energy results in changing the traditional power system planning and operation tools. As the generated power by the renewable energy resources are probabilistically changed, the certain power system analysis tolls cannot be applied in this case.  Probabilistic optimal power flow is one of the most useful tools regarding the power system analysis in presen...

متن کامل

Determination of the Energy Windows for the Triple Energy Window Scatter Correction Method in Gadolinium-159 Single Photon Emission Computed Tomography Using Monte Carlo Simulation

Introduction: In radionuclide imaging, object scatter is one of the major factors leading to image quality degradation. Therefore, the correction of scattered photons might have a great impact on improving the image quality. Regarding this, the present study aimed to determine the main and sub-energy windows for triple energy window (TEW) scatter correction method usin...

متن کامل

A method for range calculation of proton in liquid water: Validation study using Monte Carlo method and NIST data

Introduction: The main advantage of using ion beams over photons in radiotherapy is due to their inverse depth-dose profiles, allowing higher doses to tumors, while better sparing normal tissues. When calculating dose distributions with ion beams, one crucial point is the uncertainty of the Bragg-peak range. Recently great effort is devoted to enhance the accuracy of the comput...

متن کامل

Establishing Control Limits on Time Performance Indicators of Projects through Monte Carlo Simulation and Earned Duration Management

Earned Duration Management (EDM) method has been developed to enhance Earned Value Management and to solve some of its problems, such as separation of measuring time and cost dimensions. By providing performance indicators, this method makes it possible for managers to accurately measure the progress of a project and to calculate the time and cost required to complete it. Nevertheless, the acce...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Public health nutrition

دوره 7 7  شماره 

صفحات  -

تاریخ انتشار 2004