How are flood risk estimates affected by the choice of return-periods?

نویسندگان

  • P. J. Ward
  • H. de Moel
  • C. J. H. Aerts
چکیده

Flood management is more and more adopting a risk based approach, whereby flood risk is the product of the probability and consequences of flooding. One of the most common approaches in flood risk assessment is to estimate the damage that would occur for floods of several exceedance probabilities (or return periods), to plot these on an exceedance probability-loss curve (risk curve) and to estimate risk as the area under the curve. However, there is little insight into how the selection of the return-periods (which ones and how many) used to calculate risk actually affects the final risk calculation. To gain such insights, we developed and validated an inundation model capable of rapidly simulating inundation extent and depth, and dynamically coupled this to an existing damage model. The method was applied to a section of the River Meuse in the southeast of the Netherlands. Firstly, we estimated risk based on a risk curve using yearly return periods from 2 to 10 000 yr (C 34 million p.a.). We found that the overall risk is greatly affected by the number of return periods used to construct the risk curve, with over-estimations of annual risk between 33 % and 100 % when only three return periods are used. In addition, binary assumptions on dike failure can have a large effect (a factor two difference) on risk estimates. Also, the minimum and maximum return period considered in the curve affects the risk estimate considerably. The results suggest that more research is needed to develop relatively simple inundation models that can be used to produce large numbers of inundation maps, complementary to more complex 2-D–3-D hydrodynamic models. It also suggests that research into flood risk could benefit by paying more attention to the damage caused by relatively high probability floods. Correspondence to: P. J. Ward ([email protected])

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Flood zoning estimation and river management by using HEC-RAS and GIS model

Reliable estimates of river stream fl ow and fl ood zoning maps are needed for water resourcesmanagement such as fl ood mitigation, water supply, dam construction and irrigation. Flood zoning needsaccurate data and is one of the non-structural fl ood management methods. This paper describes theapplication of HEC-RAS and GIS model to determine fl oodplains maps for the part of Sardabrud Rivertha...

متن کامل

تحلیل فراوانی منطقه‌ای سیلاب با استفاده از روش کریجینگ متعارف در حوزه های آبخیز استان مازندران

Regional analysis is the stability method to improve estimates of flood frequency, which has become one of the dynamic sectors in hydrology and the new theories are testing, constantly. Application of geostatistical method is an innovation in this field for regional flood analysis.This technique is based on the interpolation of hydrological variables in the physiographical space instead of usin...

متن کامل

Flood hazard zoning using HEC-RAS in GIS environment and impact of manning roughness coefficient changes on flood zones in Semi-arid climate

Development of rural areas in rivers margins and flood plains, without understanding and attention to the dynamical and hydrological conditions and upstream areas of the rivers will cause to increase flood risk and loss of life and financial. Flood zoning has many applications, in floodplain management. For management of the three major branches of the Halilrood River, Rabor, Roodar and Javaran...

متن کامل

بررسی پتانسیل سیل خیزی حوزه های آبخیز و تعیین مناطق مولد سیل (مطالعه موردی: حوزه آبخیز نکا)

Flood is one of the natural hazards that its frequent occurrence has increased in the recent years and the damages of it, had affected apart of country in every year. Prioritization of sub basins has an important effect in watershed management. The purpose of prioritization of sub basins is offer a pattern for control and decrease flood hazards and evaluating the role of each sub basin in peak ...

متن کامل

Investigation of Impact of Bridges Built on the Main Surface Water Collection Canals by Hydraulic Simulation (Case Study: Mianroud Canal - Tehran)

Familiarity with storm water management and how to assess damage and deal with it to minimize and control it is very important in urban management systems. There are several methods for flood control that are considered depending on the hydraulic conditions. The use of main canals for surface water collection, flow diversion, catchment management, etc. are among the methods considered by urban ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2011