Flow shop scheduling with multiple operations and time lags
نویسندگان
چکیده
A scheduling system is proposed and developed for a special type of flow shop. In this flow shop there is one machine at each stage. A job may require multiple operations at each stage. The first operation of a job on stage j cannot start until the last operation of the job on stage j-1 has finished. Preemption of the operations of a job is not allowed. The flow shop that we consider has another feature, namely time lags between the multiple operations of a job. To move from one operation of a job to another requires a finite amount of time. This time lag is independent of the sequence and need not be the same for all operations or jobs. During a time lag of a job, operations of other jobs may be processed. This problem originates from a flexible manufacturing system scheduling problem where, between operations of a job on the same workstation, refixturing of the parts has to take place in a load/unload station, accompanied by (manual) transportation activities. In this paper a scheduling system is proposed in which the inherent structure of this flow shop is used in the formulation of lowerbounds on the makespan. A number of lowerbounds are developed and discussed. The use of those bounds makes it possible to generate a schedule that minimizes makespan or to construct approximate solutions. Finally, some heuristic procedures for this type of flow shop are proposed and compared with some well known heuristic scheduling rules for job shop/flow shop scheduling.
منابع مشابه
Flow Shop Scheduling Problem with Missing Operations: Genetic Algorithm and Tabu Search
Flow shop scheduling problem with missing operations is studied in this paper. Missing operations assumption refers to the fact that at least one job does not visit one machine in the production process. A mixed-binary integer programming model has been presented for this problem to minimize the makespan. The genetic algorithm (GA) and tabu search (TS) are used to deal with the optimization...
متن کاملSimultaneous production planning and scheduling in a hybrid flow shop with time periods and work shifts
Simultaneous production planning and scheduling has been identified as one of the most important factors that affect the efficient implementation of planning and scheduling operations for the production systems. In this paper, simultaneous production planning and scheduling is applied in a hybrid flow shop environment, which has numerous applications in real industrial settings. In this problem...
متن کاملHeuristics for Flow Shop Scheduling with Multiple Operations and Time Lags
This paper considers a multistage flow shop where jobs require multiple operations at each stage and a finish-to-start time lag between any two consecutive operations of a job: the next operation of a job cannot start until the time lag after the former operation of that job has elapsed. Since the problem of minimizing the make span is shown to be NP-hard even for the two-stage case, we present...
متن کاملNew Heuristic Algorithm for Flow Shop Scheduling with 3 Machines and 2 Robots Considering the Breakdown Interval of Machines and Robots Simultaneously
Scheduling is an important subject of production and operations management area. In flow-shop scheduling, the objective is to obtain a sequence of jobs which when processed in a fixed order of machines, will optimize some well defined criteria. The concept of transportation time is very important in scheduling. Transportation can be done by robots. In situations that robots are used to transpor...
متن کاملImproved teaching–learning-based and JAYA optimization algorithms for solving flexible flow shop scheduling problems
Flexible flow shop (or a hybrid flow shop) scheduling problem is an extension of classical flow shop scheduling problem. In a simple flow shop configuration, a job having ‘g’ operations is performed on ‘g’ operation centres (stages) with each stage having only one machine. If any stage contains more than one machine for providing alternate processing facility, then the problem...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- J. Intelligent Manufacturing
دوره 6 شماره
صفحات -
تاریخ انتشار 1995