A Portfolio Approach to Algorithm Selection for Discrete Time-Cost Trade-off Problem
نویسنده
چکیده
It is a known fact that the performance of optimization algorithms for NP-Hard problems vary from instance to instance. We observed the same trend when we comprehensively studied multiobjective evolutionary algorithms (MOEAs) on a six benchmark instances of discrete time-cost trade-off problem (DTCTP) in a construction project. In this paper, instead of using a single algorithm to solve DTCTP, we use a portfolio approach that takes multiple algorithms as its constituent. We proposed portfolio comprising of four MOEAs, Non-dominated Sorting Genetic Algorithm II (NSGA-II), the strength Pareto Evolutionary Algorithm II (SPEA-II), Pareto archive evolutionary strategy (PAES) and Niched Pareto Genetic Algorithm II (NPGA-II) to solve DTCTP. The result shows that the portfolio approach is computationally fast and qualitatively superior to its constituent algorithms for all benchmark instances. Moreover, portfolio approach provides an insight in selecting the best algorithm for all benchmark instances of DTCTP.
منابع مشابه
A Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm
In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...
متن کاملA Hybrid Method Based on Fuzzy AHP and VIKOR for the Discrete Time-Cost-Quality Trade-off Problem
Time, cost and quality are considered as the main components in managing each project. Previous researches have mainly focused on the time-cost trade-off problems. Recently quality is considered as the most important factor in project�s success, which is influenced by time acceleration that is the less time is spent the more success is gained. In time-cost-quality trade-off problems, each act...
متن کاملA New Heuristic Algorithm for Time-cost Trade-off Problem Taking into Account Monetary Value
Time-cost trade-off is one of the most important subjects in project management and of interest to contractors. The goal of time-cost trade-off is sensivity analysis of project costs to changes in activity duration in order to obtain the best combination of activity duration decrease, in a way that the sum of project costs is minimized. In the heuristics presented in this area, time crashing is...
متن کاملA New Heuristic Algorithm for Time-cost Trade-off Problem Taking into Account Monetary Value
Time-cost trade-off is one of the most important subjects in project management and of interest to contractors. The goal of time-cost trade-off is sensivity analysis of project costs to changes in activity duration in order to obtain the best combination of activity duration decrease, in a way that the sum of project costs is minimized. In the heuristics presented in this area, time crashing is...
متن کاملA stochastic model for project selection and scheduling problem
Resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. In this study, budget, investment costs and earnings are considered to be stochastic. The objectives are maximizing net present values of selected projects and minimizing v...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- CoRR
دوره abs/1412.1913 شماره
صفحات -
تاریخ انتشار 2014