This paper proposes two new methodologies for the placement of series FACTS devices in deregulated electricity market to reduce congestion. imilar to sensitivity factor based method, the proposed methods form a priority list that reduces the solution space. The proposed methodologies are ased on the use of LMP differences and congestion rent, respectively. The methods are computationally efficient, since LMPs are the by-product f a security constrained OPF and congestion rent is a function of LMP difference and power flows. The proposed methodologies are tested and alidated for locating TCSC in IEEE 14-, IEEE 30and IEEE 57-bus test systems. Results obtained with the proposed methods are compared with hat of the sensitivity method and with exhaustive OPF solutions. The overall objective of FACTS device placement can be either to minimize the otal congestion rent or to maximize the social welfare. Results show that the proposed methods are capable of finding the best location for TCSC nstallation, that suite both objectives. 2006 Elsevier B.V. All rights reserved.
منابع مشابه
Congestion Management in Electricity Markets Using Demand Response Programs and Series FACTS Devices
In today’s restructured environment, congestion management plays an essential role in power system operation. Different methods are presented and discussed in this respect for congestion management in short-term and long-term intervals. It is attempted in the present paper to investigate the impact mechanism of FACTS devices and demand response programs together with generation re-dispatch as s...
متن کاملLocating of Series FACTS Devices for Multi-Objective Congestion Management Using Components of Nodal Prices
Congestion and overloading for lines are the main problems in the exploitation of power grids. The consequences of these problems in deregulated systems can be mentioned as sudden jumps in prices in some parts of the power system, lead to an increase in market power and reduction of competition in it. FACTS devices are efficient, powerful and economical tools in controlling power flows through ...
متن کاملOptimal Locating and Sizing of TCPST for Congestion Management in Deregulated Electricity Markets
Congestion and overloads in transmission lines always is one of the basic problems in the power system operation. Some of the consequences of this problem in the restructured power system are sudden price increasing in some areas, increase in market power and reduction in the competition in the market. FACTS devices as an efficient, powerful and economical means can have a key role in transmiss...
متن کاملCongestion Management in Electricity Markets Using Demand Response Programs and Series FACTS Devices
In today’s restructured environment, congestion management plays an essential role in power system operation. Different methods are presented and discussed in this respect for congestion management in short-term and long-term intervals. It is attempted in the present paper to investigate the impact mechanism of FACTS devices and demand response programs together with generation re-dispatch as s...
متن کاملLocating of Series FACTS Devices for Multi-Objective Congestion Management Using Components of Nodal Prices
Congestion and overloading for lines are the main problems in the exploitation of power grids. The consequences of these problems in deregulated systems can be mentioned as sudden jumps in prices in some parts of the power system, lead to an increase in market power and reduction of competition in it. FACTS devices are efficient, powerful and economical tools in controlling power flows through ...
متن کامل