A comparison of classical scheduling approaches in power-constrained block-test scheduling
نویسندگان
چکیده
Classical scheduling approaches are applied here to overcome the problem of unequal-length block-test scheduling under power dissipation constraints. List schedulinglike approaches are proposed j r s t as greedy algorithms to tackle the fore mentioned problem. Then, distributiongraph based approaches are described in order to achieve balanced test concurrency and test power dissipation. An extended tree growing technique is also used in combination with these classical approaches in order to improve the test concurrency having assignedpower dissipation limits. A comparison between the results of the test scheduling experiments highlights the advantages and disadvantages of applying different classical scheduling algorithms to the power-constrained test scheduling problem. [email protected] partitioned testing with run to completion defined in [2]. An efficient scheme for overlaying the block-tests, called extended tree growing technique is employed to model the fore mentioned problem. Thus, traditional high-level synthesis approaches (e.g. left-edge algorithm, list scheduling and distribution-graph based scheduling) can be employed together with this model to search for power-constrained block-test schedule profiles in a polynomial time. The algorithm fully exploits test parallelism under power dissipation constraints. This is achieved by overlaying the block-test intervals of compatible subcircuits to test as many of them as possible concurrently so that the maximum accumulated power dissipation does not go over the given limit. A constant additive model is employed for the power dissipation estimation throughout the algorithms.
منابع مشابه
Resource Constrained Project Scheduling with Material Ordering: Two Hybridized Meta-Heuristic Approaches (TECHNICAL NOTE)
Resource constrained project scheduling problem (RCPSP) is mainly investigated with the objective of either minimizing project makespan or maximizing project net present value. However, when material planning plays a key role in a project, the existing models cannot help determining material ordering plans to minimize material costs. In this paper, the RCPSP incorporated with the material order...
متن کاملDistribution-graph based approach and extended tree growing technique in power-constrained block-test scheduling
A distribution-graph based scheduling algorithm is proposed together with an extended tree growing technique to deal with the problem of unequal-length block-test scheduling under power dissipation constraints. The extended tree growing technique is used in combination with the classical scheduling approach in order to improve the test concurrency having assigned power dissipation limits. Its g...
متن کاملRobust production scheduling in open-pit mining under uncertainty: a box counterpart approach
Open-Pit Production Scheduling (OPPS) problem focuses on determining a block sequencing and scheduling to maximize Net Present Value (NPV) of the venture under constraints. The scheduling model is critically sensitive to the economic value volatility of block, block weight, and operational capacity. In order to deal with the OPPS uncertainties, various approaches can be recommended. Robust opti...
متن کاملAn Evolutionary Algorithm Based on a Hybrid Multi-Attribute Decision Making Method for the Multi-Mode Multi-Skilled Resource-constrained Project Scheduling Problem
This paper addresses the multi-mode multi-skilled resource-constrained project scheduling problem. Activities of real world projects often require more than one skill to be accomplished. Besides, in many real-world situations, the resources are multi-skilled workforces. In presence of multi-skilled resources, it is required to determine the combination of workforces assigned to each activity. H...
متن کاملThe preemptive resource-constrained project scheduling problem subject to due dates and preemption penalties: An integer programming approach
Extensive research has been devoted to resource constrained project scheduling problem. However, little attention has been paid to problems where a certain time penalty must be incurred if activity preemption is allowed. In this paper, we consider the project scheduling problem of minimizing the total cost subject to resource constraints, earliness-tardiness penalties and preemption penalties, ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2000