Parallel machine scheduling problem to minimize the makespan with resource dependent processing times

نویسندگان

  • Kai Li
  • Ye Shi
  • Shanlin Yang
  • Bayi Cheng
چکیده

This paper considers the identical parallel machine scheduling problem to minimize the makespan with controllable processing times, in which the processing times are linear decreasing functions of the consumed resource. The total resource consumption is limited. This problem is NP-hard even if the total resource consumption equals to zero. Two kinds of machines, critical machine and non-critical machine, are defined. Some theoretical results are provided. And then, a simulated annealing algorithm is designed to obtain the near-optimal solutions with high quality. To evaluate the performance of the proposed algorithm, we generate the random test data in our experiment to simulate the ingot preheating before hot-rolling process in steel mills. The accuracy and efficiency of the simulated annealing algorithm is tested based on the data with problem size varying from 200 jobs to 1000 jobs. By examining 10,000 randomly generated instances, the proposed simulated annealing algorithm shows an excellent performance in not only the solution quality but also the computation time. © 2011 Elsevier B.V. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A fuzzy mixed-integer goal programming model for a parallel machine scheduling problem with sequence-dependent setup times and release dates

This paper presents a new mixed-integer goal programming (MIGP) model for a parallel machine scheduling problem with sequence-dependent setup times and release dates. Two objectives are considered in the model to minimize the total weighted flow time and the total weighted tardiness simultaneously. Due to the com-plexity of the above model and uncertainty involved in real-world scheduling probl...

متن کامل

SINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT

In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...

متن کامل

Minimizing the total tardiness and makespan in an open shop scheduling problem with sequence-dependent setup times

We consider an open shop scheduling problem with setup and processing times separately such that not only the setup times are dependent on the machines, but also they are dependent on the sequence of jobs that should be processed on a machine. A novel bi-objective mathematical programming is designed in order to minimize the total tardiness and the makespan. Among several mult...

متن کامل

Meta heuristic for Minimizing Makespan in a Flow-line Manufacturing Cell with Sequence Dependent Family Setup Times

This paper presents a new mathematical model for the problem of scheduling part families and jobs within each part family in a flow line manufacturing cell where the setup times for each family are sequence dependent and it is desired to minimize the maximum completion time of the last job on the last machine (makespan) while processing parts (jobs) in each family together. Gaining an optimal s...

متن کامل

A bi-objective model for a scheduling problem of unrelated parallel batch processing machines with fuzzy parameters by two fuzzy multi-objective meta-heuristics

This paper considers a bi-objective model for a scheduling problem of unrelated parallel batch processing machines to minimize the makespan and maximum tardiness, simultaneously. Each job has a specific size and the data corresponding to its ready time, due date and processing time-dependent machine are uncertain and determined by trapezoidal fuzzy numbers. Each machine has a specific capacity,...

متن کامل

A Mathematical Model for a Flow Shop Scheduling Problem with Fuzzy Processing Times

This paper presents a mathematical model for a flow shop scheduling problem consisting of m machine and n jobs with fuzzy processing times that can be estimated as independent stochastic or fuzzy numbers. In the traditional flow shop scheduling problem, the typical objective is to minimize the makespan). However,, two significant criteria for each schedule in stochastic models are: expectable m...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Appl. Soft Comput.

دوره 11  شماره 

صفحات  -

تاریخ انتشار 2011