Multiproduct multiple-buyer single-vendor supply chain problem with stochastic demand, variable lead-time, and multi-chance constraint

نویسندگان

  • Ata Allah Taleizadeh
  • Seyed Taghi Akhavan Niaki
  • Ahmad Makui
چکیده

In this paper, a multi-product multi-chance constraint joint single-vendor multi-buyers inventory problem is considered in which the demand follows a uniform distribution, the lead-time is assumed to vary linearly with respect to the lot size, and the shortage in combination of backorder and lost-sale is assumed. Furthermore, the orders are placed in multiple of packets, there is a limited space available for the vendor, there are chance constraints on the vendor service rate to supply the products, and there is a limited budget for each buyer to purchase the products. While the elements of the buyers' cost function are holding, shortage, order and transportation costs, the set up and holding costs are assumed for the vendor. The goal is to determine the re-order point and the order quantity of each product for each buyer such that the chain total cost is minimized. We show the model of this problem to be a mixed integer nonlinear programming type and in order to solve it a particle swarm optimization (PSO) approach is used. To justify the results of the proposed PSO algorithm, a genetic algorithm (GA) is applied as well to solve the problem. Then, the quality of the results and the CPU times of reaching the solution are compared through three numerical examples that are given to demonstrate the applicability of the proposed methodology in real world inventory control problems. The comparison results show the PSO approach has better performances than the GA method.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Joint single vendor-single buyer supply chain problem with stochastic demand and fuzzy lead-time

In this paper, a chance-constraint joint single vendor, single buyer supply chain problem with stochastic demand and fuzzy lead-time is investigated. The lead-time is lot size dependent; and delay times such as moving, waiting and setting time are fuzzy. The shortage costs result from backorder and/or lost sale, and the uncertain demand follows a uniform distribution. The buyer’s cost function ...

متن کامل

Vendor Managed Inventory of a Supply Chain under Stochastic Demands

In this research, an integrated inventory problem is formulated for a single-vendor multiple-retailer supply chain that works according to the vendor managed inventory policy. The model is derived based on the economic order quantity in which shortages with penalty costs at the retailers` level is permitted. As predicting customer demand is the most important problem in inventory systems and th...

متن کامل

A discrete particle swarm optimization algorithm with local search for a production-based two-echelon single-vendor multiple-buyer supply chain

This paper formulates a two-echelon single-producer multi-buyer supply chain model, while a single product is produced and transported to the buyers by the producer. The producer and the buyers apply vendor-managed inventory mode of operation. It is assumed that the producer applies economic production quantity policy, which implies a constant production rate at the producer. The operational pa...

متن کامل

Comparison and Supply Chain Optimization for Vendor-Buyer Coordination System

Here, we consider single vendor-buyer model with multi-product and multi-customer and multi-facility location-production-distribution problem. It is assumed that the players of the supply chain are coordinated by sharing information. Vendor manufactures produce different products at different plants with limited capacities and then distribute the products to the consumers according to determini...

متن کامل

A single-vendor and a single-buyer integrated inventory model with ordering cost reduction dependent on lead time

Lead time is one of the major limits that affect planning at every stage of the supply chain system. In this paper, we study a continuous review inventory model. This paper investigates the ordering cost reductions are dependent on lead time. This study addressed two-echelon supply chain problem consisting of a single vendor and a single buyer. The main contribution of this study is that the in...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Expert Syst. Appl.

دوره 39  شماره 

صفحات  -

تاریخ انتشار 2012