Mathematical model and supporting algorithm to aid the sequencing and scheduling of mining with loading equipment allocation
نویسندگان
چکیده
This paper focuses on the sequencing and scheduling problem of open pit mining, with the allocation of loading equipment considering a medium-term horizon. This study considers the existence of a heterogeneous loading equipment fleet and two types of mineable material, namely ore or waste rock. For the mining of ore, the following requirements are taken under consideration: the mixture quality, a crusher, the processing plant capacity and a stockpile, called ROM stockpile. In this context, we present a mathematical model in mixed integer linear programming, supported by an algorithm that is responsible for moving the time horizon at each model run, aiming to generate mining orders resolved with optimality. Together, these orders describe the loading equipment mining plan.
منابع مشابه
A Mathematical Model to Optimize Allocation Sequence in Dispatching Problem
Truck-Shovel fleet, as the most common transportation system in open-pit mines, has a significant part of mining costs, for which optimal management can lead to substantial cost reductions. Among the available dispatch mathematical models, the multi-stage approach is well suited for allocating trucks to respected shovels in a dynamic dispatching program. However, with this kind of modeling sequ...
متن کاملQuay Cranes and Yard Trucks Scheduling Problem at Container Terminals
A bi-objective mathematical model is developed to simultaneously consider the quay crane and yard truck scheduling problems at container terminals. Main real-world assumptions, such as quay cranes with non-crossing constraints, quay cranes’ safety margins and precedence constraints are considered in this model. This integrated approach leads to better efficiency and productivity at container te...
متن کاملA New Mathematical Model for Production Scheduling in Sub-level Caving Mining Method
Production scheduling in underground mines is still a manual process, and achieving a truly optimal result through manual scheduling is impossible due to the complexity of the scheduling problems. Among the underground mining methods, sub-level caving is a common mining method with a high production rate for hard rock mining. There are limited studies about long-term production scheduling...
متن کاملA Mathematical Model and Grouping Imperialist Competitive Algorithm for Integrated Quay Crane and Yard Truck Scheduling Problem with Non-crossing Constraint
In this research, an integrated approach is presented to simultaneously solve quay crane scheduling and yard truck scheduling problems. A mathematical model was proposed considering the main real-world assumptions such as quay crane non-crossing, precedence constraints and variable berthing times for vessels with the aim of minimizing vessels completion time. Based on the numerical results, thi...
متن کاملA genetic algorithm approach for open-pit mine production scheduling
In an Open-Pit Production Scheduling (OPPS) problem, the goal is to determine the mining sequence of an orebody as a block model. In this article, linear programing formulation is used to aim this goal. OPPS problem is known as an NP-hard problem, so an exact mathematical model cannot be applied to solve in the real state. Genetic Algorithm (GA) is a well-known member of evolutionary algorithms...
متن کامل