Time/Cost Optimization in Grid Scheduling: Analytical Results and Practical Implications

نویسندگان

  • Django Armstrong
  • Karim Djemame
  • Natalia V. Shakhlevich
چکیده

An important aspect of Grid scheduling is efficient allocation of computation tasks to Grid resources. Recent trends in Grid computing involve Quality of Service provision which ensures that an application is performed within a guaranteed time at a pre-specified cost. We develop efficient algorithms for finding a trade-off between computation time and resource usage cost which gives resource providers and users a range of Quality-of-Service options to select from. Theoretical outcomes obtained for simplified models are generalized for a more complex model of scheduling workflows. Computational experiments demonstrate that the rule that prioritizes the processors in accordance with the cost-over-speed ratio outperforms the rule which considers the cost and the speed parameters separately.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project

This paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. The net present value (NPV) maximization and making span minimization are this study objectives. And since this problem is considered as complex optimization in NP-Hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...

متن کامل

Project scheduling optimization for contractor’s Net present value maximization using meta-heuristic algorithms: A case study

Today's competitive conditions have caused the projects to be carried out in the least possible time with limited resources. Therefore, managing and scheduling a project is a necessity for the project. The timing of a project is to specify a sequence of times for a series of related activities. According to their priority and their latency, so that between the time the project is completed and ...

متن کامل

Optimal Operation of Integrated Energy Systems Considering Demand Response Program

This study presents an optimal framework for the operation of integrated energy systems using demand response programs. The main goal of integrated energy systems is to optimally supply various demands using different energy carriers such as electricity, heating, and cooling. Considering the power market price, this work investigates the effects of multiple energy storage devices and demand res...

متن کامل

Optimization of Time, Cost, and Quality in Critical Chain Method Using Simulated Annealing (RESEARCH NOTE)

In the last decade, theory of constraint application in project management lead to make a new approach for project scheduling and control as a critical chain. In this paper, a multi-objective optimization model for multi-project scheduling on critical chain is investigated. The objectives include time, cost and quality. In order to solve the problem, a Simulated Annealing algorithm is developed...

متن کامل

Optimizing the Static and Dynamic Scheduling problem of Automated Guided Vehicles in Container Terminals

The Minimum Cost Flow (MCF) problem is a well-known problem in the area of network optimisation. To tackle this problem, Network Simplex Algorithm (NSA) is the fastest solution method. NSA has three extensions, namely Network Simplex plus Algorithm (NSA+), Dynamic Network Simplex Algorithm (DNSA) and Dynamic Network Simplex plus Algorithm (DNSA+). The objectives of the research reported in this...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2014