Piecewise Procurement of a Large-Scale Project

نویسنده

  • Huseyin Yildirim
چکیده

This paper studies the optimal procurement of a large-scale project. The project consists of several subprojects to be procured in a predetermined order and yields its full return upon completion. In the unique Markov perfect equilibrium of the dynamic procurement game, I find that: (1) Even though the procurer lacks long term commitment power, both the procurer and suppliers strictly prefer the project to move forward; (2) unlike the static setting, the procurer’s optimal strategy depends on the number of suppliers and more importantly, it is nonmonotonic. As one more supplier participates in the procurement auction, the procurer softens competition in the initial stages by including more cost “types” while increasing competition in the mature stages, (3) this, in turn, implies that existing suppliers might favor participation of additional suppliers, and actively search for new bidders along with the procurer, and (4) absent the scheduling and resource constraints, the procurer would prefer to procure the project as one piece if the suppliers’ technology exhibited constant or increasing returns, and no additional suppliers were attracted to bid. This rationalizes the frequent division of large-scale projects on the grounds of either decreasing returns to scale technology, e.g., capacity constraints, or enabling smaller firms to enter the bidding process. I also demonstrate that the optimal dynamic mechanism can be easily implemented via a sequence of dominant strategy auctions of the Vickrey type.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Towards Measuring the Project Management Process During Large Scale Software System Implementation Phase

Project management is an important factor to accomplish the decision to implement large-scale software systems (LSS) in a successful manner. The effective project management comes into play to plan, coordinate and control such a complex project. Project management factor has been argued as one of the important Critical Success Factor (CSF), which need to be measured and monitored carefully duri...

متن کامل

Cause and Effect Analysis of Risks of Refinery Developmental Turnkey Projects through System Dynamics Approach Case Study: Development Project of Third Distillation Unit and LPG (Liquefied Petroleum Gas) in Isfahan Oil Refinery

Project managers are grappling with a variety of risks today as a result of increasing complexity and dynamics of projects in different stages of project life cycle. Thus, it seems quite necessary to employ an efficient risk management process that can overcome the shortcomings of traditional methods in order to handle such complexities and reach the optimal project management. This matter is e...

متن کامل

Cause and Effect Analysis of Risks of Refinery Developmental Turnkey Projects through System Dynamics Approach Case Study: Development Project of Third Distillation Unit and LPG (Liquefied Petroleum Gas) in Isfahan Oil Refinery

Project managers are grappling with a variety of risks today as a result of increasing complexity and dynamics of projects in different stages of project life cycle. Thus, it seems quite necessary to employ an efficient risk management process that can overcome the shortcomings of traditional methods in order to handle such complexities and reach the optimal project management. This matter is e...

متن کامل

A Fuzzy Decision-Making Methodology for Risk Response Planning in Large-Scale Projects

Risk response planning is one of the main phases in the project risk management and has major impacts on the success of a large-scale project. Since projects are unique, and risks are dynamic through the life of the projects, it is necessary to formulate responses of the important risks. The conventional approaches tend to be less effective in dealing with the impreciseness of risk response p...

متن کامل

A Multi-Criteria Decision-Making Approach with Interval Numbers for Evaluating Project Risk Responses

The risk response development is one of the main phases in the project risk management that has major impacts on a large-scale project’s success. Since projects are unique, and risks are dynamic through the life of the projects, it is necessary to formulate responses of the important risks. Conventional approaches tend to be less effective in dealing with the imprecise of the risk response deve...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2003