North American Resource Adequacy: "Déjà Vu, All Over Again"

نویسنده

  • Richard D. Tabors
چکیده

Restructuring of the US electric power system that began in the late 1990’s appears to have run aground over the question of the assurance of both regulatory resource adequacy and generator long-term revenue sufficiency. The energy and capacity markets that have been designed for a number of the centralized markets in the US and elsewhere have not functioned as designed. Energy only markets such as ERCOT appear to have functioned equally poorly, albeit for totally different reasons. This paper reviews the underlying structure and logic of both the Capacity Market structures and the alternatives available in the energy-only markets. It focuses attention on the reality of the “missing money.” The paper returns to first principles in market design and concludes with an argument for an alternative energy only framework that provides for resource adequacy, revenue recovery and increased price signaling to large customers.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Particulate pollution and endothelial function: déjà vu all over again in the air.

Copyright © 2005 American Heart Association. All rights reserved. Print ISSN: 0009-7322. Online 72514 Circulation is published by the American Heart Association. 7272 Greenville Avenue, Dallas, TX DOI: 10.1161/CIRCULATIONAHA.105.540872 2005;111;2869-2871 Circulation Sanjay Rajagopalan, Qinghua Sun and Lung Chi Chen Air Particulate Pollution and Endothelial Function: Déjà Vu All Over Again in th...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2013