The Product Flow Model

نویسنده

  • Gio Wiederhold
چکیده

We observed a new approach being adopted in the software industry that combines a business model with strong technical support. This Product Flow Model combines aspects of the Product Line model with workflow concepts for virtual enterprises. The Product Flow Model (PFM) addresses the costly ongoing maintenance of major products being delivered to customers. When such maintenance is provided by internal information technology (IT) operations for software then little overall lifetime cost reduction has been achieved by reduced software acquisition costs, since maintenance consumes 70 to 90% of total lifetime software costs. A software supplier operating according to PFM also provides the ongoing maintenance to the customer. In order service the customer effectively there must be an effective information flow expressing the needs of the customer to the software supplier. We perceive three classes of needs, leading to corrective, adaptive, and perfective maintenance. Software supplier that operate within the PFM can be assured of substantial continuing income and great customer loyalty. We will elaborate both on the information flow and on technologies needed to be successful in PFM services.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Customer Order Scheduling with Job-Based Processing and Lot Streaming In A Two-Machine Flow Shop

This paper considers a customer order scheduling (COS) problem in which each customer requests a variety of products processed in a two-machine flow shop. A sequence-independent attached setup for each machine is needed before processing each product lot. We assume that customer orders are satisfied by the job-based processing approach in which the same products from different customer orders f...

متن کامل

The Finite Horizon Economic Lot Scheduling in Flexible Flow Lines

This paper addresses the common cycle multi-product lot-scheduling problem in flexible flow lines (FFL) where the product demands are deterministic and constant over a finite planning horizon. Objective is minimizing the sum of setup costs, work-in-process and final products inventory holding costs per time unite while satisfying the demands without backlogging. This problem consists of a combi...

متن کامل

Retrieval–travel-time model for free-fall-flow-rack automated storage and retrieval system

Automated storage and retrieval systems (AS/RSs) are material handling systems that are frequently used in manufacturing and distribution centers. The modelling of the retrieval–travel time of an AS/RS (expected product delivery time) is practically important, because it allows us to evaluate and improve the system throughput. The free-fall-flow-rack AS/RS has emerged as a new technology for dr...

متن کامل

EOQ Model with Cash Flow Oriented and Quantity Dependent Under Trade Credits (TECHNICAL NOTE)

Inventory models in which the demand rate dependents on the stock- dependent are based on the common real- life observation that greater product availability tends to stimulate more sales. In this study we develop an inventory model to determine an optimal ordering policy for quantity dependent demand rate and time dependent holding cost items with delay in payments permitted by the supplier un...

متن کامل

A Flow shop Production Planning Problem with basic period policy and Sequence Dependent set up times

Many authors have examined lot sizing, scheduling and sequence of multi-product flow shops, but most of them have assumed that set up times are independent of sequence. Whereas dependence of set up times to sequence is more common in practice. Hence, in this paper, we examine the discussed problem with hypothesis of dependence of set up times to sequence and cyclic schedule policy in basic peri...

متن کامل

Supply chain master planning considering material-financial flows

In this study, tactical decisions considering the material and financial flows in a supply chain have been made. To achieve these aims and some effective solutions, a multi-objective mathematical model proposed for an integrated supply chain master planning problem. The multi-product, multi-period and capacitated supply chain network has three objective functions. Two first objective functions ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2003