A Mixed Integer Programming for Port Anzali Development Plan
نویسنده
چکیده
This paper introduces a mixed integer programming model to find the optimum development plan for port Anzali. The model minimizes total system costs taking into account both port infrastructure costs and shipping costs. Due to the multipurpose function of the port, the model consists of 1020 decision variables and 2490 constraints. Results of the model determine the optimum number of berths that should be constructed in each period and for each type of cargo. In addition to, the results of sensitivity analysis on port operation quantity provide useful information for managers to choose the best scenario for port planning with the lowest investment risks. Despite all limitations-due to data availability-the model offers a straightforward decision tools to port planners aspiring to achieve optimum port planning steps. Keywords—MILP, Multipurpose Terminal, Port Operation Optimization, Port Anzali.
منابع مشابه
Exact Mixed Integer Programming for Integrated Scheduling and Process Planning in Flexible Environment
This paper presented a mixed integer programming for integrated scheduling and process planning. The presented process plan included some orders with precedence relations similar to Multiple Traveling Salesman Problem (MTSP), which was categorized as an NP-hard problem. These types of problems are also called advanced planning because of simultaneously determining the appropriate sequence and m...
متن کاملSufficient global optimality conditions for general mixed integer nonlinear programming problems
In this paper, some KKT type sufficient global optimality conditions for general mixed integer nonlinear programming problems with equality and inequality constraints (MINPP) are established. We achieve this by employing a Lagrange function for MINPP. In addition, verifiable sufficient global optimality conditions for general mixed integer quadratic programming problems are der...
متن کاملComparing Mixed-Integer and Constraint Programming for the No-Wait Flow Shop Problem with Due Date Constraints
The impetus for this research was examining a flow shop problem in which tasks were expected to be successively carried out with no time interval (i.e., no wait time) between them. For this reason, they should be completed by specific dates or deadlines. In this regard, the efficiency of the models was evaluated based on makespan. To solve the NP-Hard problem, we developed two mathematical mode...
متن کاملALTERNATIVE MIXED INTEGER PROGRAMMING FOR FINDING EFFICIENT BCC UNIT
Data Envelopment Analysis (DEA) cannot provide adequate discrimination among efficient decision making units (DMUs). To discriminate these efficient DMUs is an interesting research subject. The purpose of this paper is to develop the mix integer linear model which was proposed by Foroughi (Foroughi A.A. A new mixed integer linear model for selecting the best decision making units in data envelo...
متن کاملA fuzzy mixed-integer goal programming model for a parallel machine scheduling problem with sequence-dependent setup times and release dates
This paper presents a new mixed-integer goal programming (MIGP) model for a parallel machine scheduling problem with sequence-dependent setup times and release dates. Two objectives are considered in the model to minimize the total weighted flow time and the total weighted tardiness simultaneously. Due to the com-plexity of the above model and uncertainty involved in real-world scheduling probl...
متن کامل