Sequential Investment in Pollution Control Equipment under Uncertainty

نویسنده

  • Motoh Tsujimura
چکیده

Overview This paper investigates the investment in pollution control equipment under uncertainty. We assume that a firm's output generates a pollution by-product and the pollution reduces the productivity of capital. The dynamics of pollution is assumed to be governed by stochastic differential equation. Then, the firm has to invest in a pollution control equipment in order to reduce the pollutant and it incurs equipment cost. The firm also pays environmental tax to use input. In this paper, we assume that the firm can invest it as needed. Then, the firm's problem is to choose the investment timing under uncertainty and is formulated a singular stochastic control problem. We solve the firm's problem by using variational inequalities and obtain the optimal investment strategy which is described by the threshold to invest in the pollution control equipment. Furthermore, we conduct a comparative static analysis on some parameters.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Investment in site-specific crop management under uncertainty: implications for nitrogen pollution control and environmental policy

This paper applies an option-pricing model to analyze the impact of uncertainty about output prices and expectations of declining fixed costs on the optimal timing of investment in site-specific crop management (SSCM). It also analyzes the extent to which the level of spatial variability in soil conditions can mitigate the value of waiting to invest in SSCM and influence the optimal timing of a...

متن کامل

Market segmentation under uncertainty

This paper proposes a general model to value different strategies to enter a market, comparing alternative sequential segmentation paths to simultaneous investment in all segments. This general model also allows demand to evolve accordingly to an endogenous regimeswitching process, under which it can behave differently before and after investment. It is shown how uncertainty, revenues and inves...

متن کامل

A Robust Reliable Closed Loop Supply Chain Network Design under Uncertainty: A Case Study in Equipment Training Centers

The aim of this paper is to propose a robust reliable bi-objective supply chain network design (SCND) model that is capable of controlling different kinds of uncertainties, concurrently. In this regard, stochastic bi-level scenario based programming approach which is used to model various scenarios related to strike of disruptions. The well-known method helps to overcome adverse effects of disr...

متن کامل

Application of Sequential Gaussian Conditional Simulation to Underground Mine Design Under Grade Uncertainty

In mining projects, all uncertainties associated with a project must be considered to determine the feasibility study. Grade uncertainty is one of the major components of technical uncertainty that affects the variability of the project. Geostatistical simulation, as a reliable approach, is the most widely used method to quantify risk analysis to overcome the drawbacks of the estimation methods...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2012