Hydro-electric unit commitment subject to uncertain demand

نویسندگان

  • Andrew B. Philpott
  • Mark Craddock
  • Hamish Waterer
چکیده

Hydro-electric power utilities convert the potential energy of water to electricity through the operation of generation turbines. Each turbine unit has an operating range and incurs a fixed start-up cost. The problem of determining which turbines should be operating at any point during the day whilst ensuring that the demand for electricity is satisfied is known as the unit commitment problem. The power utility is faced with de­ termining a 24-hour generation plan for each turbine given that the demand later in the day is not known with certainty. In this paper a method combining stochastic linear and stochastic dynamic programming is presented for determining a generation schedule for each turbine that hedges against the uncertainty in the future electricity demand.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Incorporating Wind Power Generation And Demand Response into Security-Constrained Unit Commitment

Wind generation with an uncertain nature poses many challenges in grid integration and secure operation of power system. One of these operation problems is the unit commitment. Demand Response (DR) can be defined as the changes in electric usage by end-use customers from their normal consumption patterns in response to the changes in the price of electricity over time. Further, DR can be also d...

متن کامل

Security Constrained Unit Commitment in the Simultaneous Presence of Demand Response Sources and Electric Vehicles

Due to the ever-growing load, especially peak load, the increase in the capacity of plants is inevitable for the response to this growth. Peak load causes increases in customer costs and vast investments in generating and transmission parts. Therefore, restructuring in the electrical industry, competition in the electrical market and Demand Response Programs (DRPs) are of special importance in ...

متن کامل

Unit Commitment in Presence of Wind Power Plants and Energy Storage

As renewable energy increasingly penetrates into power grid systems, new challenges arise for system operators to keep the systems reliable under uncertain circumstances, while ensuring high utilization of renewable energy. This paper presents unit commitment (UC) which takes into account the volatility of wind power generation. The UC problem is solved with the forecasted intermittent wind pow...

متن کامل

Stochastic Unit Commitment in the Presence of Demand Response Program under Uncertainties

In this paper, impacts of various uncertainties such as random outages of generating units and transmission lines, forecasting errors of load demand and wind power, in the presence of Demand response (DR) programs on power generation scheduling are studied. The problem is modelled in the form of a two-stage stochastic unit commitment (UC) which by solving it, the optimal solutions of UC as well...

متن کامل

Stochastic Unit Commitment in Hydro-Thermal Power Production Planning

Economic needs and the ongoing liberalization of European electricity markets stimulate the interest of power utilities in developing models and optimization techniques for the generation and trading of electric power under uncertainty. Utilities participating in deregulated markets observe increasing uncertainty in load (i.e., demand for electric power) and prices for fuel and electricity on s...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • European Journal of Operational Research

دوره 125  شماره 

صفحات  -

تاریخ انتشار 2000