Automatic Generation and Visualization of Location-based Scheduling
نویسندگان
چکیده
ABSTRACT: Accurate and visual information of working locations is vital for efficient resource planning and location-based scheduling of earthworks, which is missing in existing linear schedules. Thus, construction managers have to depend on subjective decisions for resources allocation and progress monitoring from location aspects. This has caused uncertainties in planning and scheduling, and consequently delays and cost overruns of projects. A framework of prototype model was developed using the theory of location-based planning to overcome the above issues. This paper focuses on a case study experiments to demonstrate the functions of the model, which includes automatic generation of location-based earthwork schedules and visualization of cut-fill locations on a weekly basis. An arithmetic algorithm was developed by incorporating road design data, sectional quantities, variable productivity rates, unit cost and haulage distance. The model provides weekly information of locations, directions and cut-fill quantities of earthwork under different selections: construction sequences of cut/fill sections, site access points and equipment sets. The paper concludes that the model assists in identifying the correct locations and visualizing the space congestion during earthwork operations. Hence, project resources including heavy equipment and construction materials should be allocated more effectively and correctly from the location viewpoints and ultimately to improve site productivity and reduce production cost in linear projects.
منابع مشابه
جایابی و تعیین بهینه ظرفیت واحدهای تولید همزمان گازسوز جهت تأمین برق و حرارت در یک شهرک صنعتی
Load serving entities (LSE) of industrial district that have the operation responsibility of electric network, must procure the consumers electricity from wholesale electric market or the utility’s distributed generation (DG). The generation expansion planning (GEP) has a crucial impact on the optimality of LSE’s operation. In this paper, an innovative GEP is presented in which the location, ti...
متن کاملA THEORETICALLY CORRECT RESOURCE USAGE VISUALIZATION FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM
The cumulative resource constraints of the resource-constrained project scheduling problem (RCPSP) do not treat the resource demands as geometric rectangles, that is, activities are not necessarily assigned to the same resource units over their processing times. In spite of this fact, most papers on resource-constrained project scheduling mainly in the motivation phase use a strip packing of re...
متن کاملDesign of Fuzzy Logic Based PI Controller for DFIG-based Wind Farm Aimed at Automatic Generation Control in an Interconnected Two Area Power System
This paper addresses the design procedure of a fuzzy logic-based adaptive approach for DFIGs to enhance automatic generation control (AGC) capabilities and provide better dynamic responses in multi-area power systems. In doing so, a proportional-integral (PI) controller is employed in DFIG structure to control the governor speed of wind turbine. At the first stage, the adjustable parameters of ...
متن کاملAn Integrated Model for Storage Location Assignment and Storage/Retrieval Scheduling in AS/RS system
An integrated optimization framework, including location assignment under grouping class-based storage policy and schedule of dual shuttle cranes, is offered by presenting a new optimization programming model. The objective functions, which are considered at this level, are the minimization of total costs and energy consumption. Scheduling of dual shuttle cranes among specified locations, which...
متن کاملStochastic Joint Optimal Distributed Generation Scheduling and Distribution Feeder Reconfiguration of Microgrids Considering Uncertainties Modeled by Copula-Based Method
Using distributed generations (DGs) with optimal scheduling and optimal distribution feeder reconfiguration (DFR) are two aspects that can improve efficiency as well as technical and economic features of microgrids (MGs). This work presents a stochastic copula scenario-based framework to jointly carry out optimal scheduling of DGs and DFR. This framework takes into account non-dispatchable and ...
متن کامل