Optimal Power Flow Based on Hybrid Genetic Algorithm
نویسندگان
چکیده
Optimal Power Flow (OPF) is one of the main functions of Power Generation Operation and Control. It determines the optimal settings of generating units, bus voltage, and transformer tap and shunt elements in Power System with the objective of minimizing total production costs or losses while the system is operating within its security limits. The aim of this paper is to propose a methodology (GA-Matpower-OPF) that solves OPF including both active and reactive power dispatches. It is based on combining the Genetic Algorithm (GA) to obtain a near global solution, and the package of Matlab m-files for solving power flow and optimal power flow problems (Matpower) to determine the optimal global solution. This method was tested on the modified IEEE 57 bus test system. The results obtained by this method are compared with those obtained with GA or Matpower separately.
منابع مشابه
Solving Multi-objective Optimal Power Flow Using Modified GA and PSO Based on Hybrid Algorithm
The Optimal Power Flow (OPF) is one of the most important issues in the power systems. Due to the complexity and discontinuity of some parameters of power systems, the classic mathematical methods are not proper for this problem. In this paper, the objective function of OPF is formulated to minimize the power losses of transmission grid and the cost of energy generation and improve the voltage ...
متن کاملOptimal Bidding Strategies of GENCOs in Day-Ahead Energy and Spinning Reserve Markets Based on Hybrid GA-Heuristic Optimization Algorithm
In an electricity market, every generation company (GENCO) attempts to maximize profit according to other participants bidding behaviors and power systems operating conditions. The goal of this study is to examine the optimal bidding strategy problem for GENCOs in energy and spinning reserve markets based on a hybrid GA-heuristic optimization algorithm. The heuristic optimization algorithm used...
متن کاملA novel hybrid genetic algorithm to solve the make-to-order sequence-dependent flow-shop scheduling problem
Flow-shop scheduling problem (FSP) deals with the scheduling of a set of n jobs that visit a set of m machines in the same order. As the FSP is NP-hard, there is no efficient algorithm to reach the optimal solution of the problem. To minimize the holding, delay and setup costs of large permutation flow-shop scheduling problems with sequence-dependent setup times on each machine, this pap...
متن کاملOptimal power management of fuel cell hybrid vehicles
This paper presents a control strategy developed for optimizing the power flow in a Fuel Cell Hybrid Vehicle structure. This method implements an on-line power management based on the optimal fuzzy controller between dual power sources that consist of a battery bank and a Fuel Cell (FC). The power management strategy in the hybrid control structure is crucial for balancing between efficiency an...
متن کاملFinding the Optimal Path to Restoration Loads of Power Distribution Network by Hybrid GA-BCO Algorithms Under Fault and Fuzzy Objective Functions with Load Variations
In this paper proposes a fuzzy multi-objective hybrid Genetic and Bee colony optimization algorithm(GA-BCO) to find the optimal restoration of loads of power distribution network under fault.Restoration of distribution systems is a complex combinatorial optimization problem that should beefficiently restored in reasonable time. To improve the efficiency of restoration and facilitate theactivity...
متن کاملA Hierarchy Topology Design Using a Hybrid Evolutionary Algorithm in Wireless Sensor Networks
Wireless sensor network a powerful network contains many wireless sensors with limited power resource, data processing, and transmission abilities. Wireless sensor capabilities including computational capacity, radio power, and memory capabilities are much limited. Moreover, to design a hierarchy topology, in addition to energy optimization, find an optimum clusters number and best location of ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- J. Inf. Sci. Eng.
دوره 23 شماره
صفحات -
تاریخ انتشار 2007