Flexible Process Planning and Production Control Using Co-operative Agent Systems

نویسنده

  • H. K. Tönshoff
چکیده

Nowadays, one of the greatest challenges companies have to face is the change towards flexible and demand-driven production. More information has to be handled and a considerable speed-up of development and manufacturing processes is needed. However, the actual situation is characterized by strong borderlines between process planning, production control and scheduling systems, caused by extreme specialisation and independent historical paths of system evolution. This gap implies loss of time and of information. Thus, there is a strong need for innovative concepts for management and control of integrated information logistics, production scheduling and process planning. Agent-based information technologies like the innovative concept of co-operative agent systems are promising approaches for more flexible and distributed production networks. Agents are autonomously, co-operatively and goal-oriented acting intelligent software units. The use of agents for managing information within production control and process planning makes short term and flexible reaction to unexpected events and disturbances in manufacturing (e.g. break down of machines or lack of other resources as well as unexpected change of market situation) possible. Thus, enterprises will react to changing requirements in a more flexible way and will be able to face the challenges of international competition successfully.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Exact Mixed Integer Programming for Integrated Scheduling and Process Planning in Flexible Environment

This paper presented a mixed integer programming for integrated scheduling and process planning. The presented process plan included some orders with precedence relations similar to Multiple Traveling Salesman Problem (MTSP), which was categorized as an NP-hard problem. These types of problems are also called advanced planning because of simultaneously determining the appropriate sequence and m...

متن کامل

Simultaneous Lot Sizing and Scheduling in a Flexible Flow Line

This paper breaks new ground by modelling lot sizing and scheduling in a flexible flow line (FFL) simultaneously instead of separately. This problem, called the ‘General Lot sizing and Scheduling Problem in a Flexible Flow Line’ (GLSP-FFL), optimizes the lot sizing and scheduling of multiple products at multiple stages, each stage having multiple machines in parallel. The objective is to satisf...

متن کامل

Production Planning and Control Strategies Used as A Gear Train for The Death and Birth of Manufacturing Industries

This study is conducted to developed innovative production planning and control strategies to manufacturing industries so as to improve production performance and competitiveness of basic metal sectors Though the study was conducted through field observation and questioner used as primary data and literature review on research articles, books, and electronic-sources which used as secondar...

متن کامل

Flexible Manufacturing Process Planning based on the Multi-agent Technology

Flexible manufacturing systems working in highly dynamic modern markets requires innovative concepts towards flexible management, production scheduling and planning. The agent-based technology provides a desired flexibility, supports a short reaction time and can underlie the required planning mechanismes. Moreover it does not require any centralized elements allowing a distributed implementati...

متن کامل

A Hierarchical Production Planning and Finite Scheduling Framework for Part Families in Flexible Job-shop (with a case study)

Tendency to optimization in last decades has resulted in creating multi-product manufacturing systems. Production planning in such systems is difficult, because optimal production volume that is calculated must be consistent with limitation of production system. Hence, integration has been proposed to decide about these problems concurrently. Main problem in integration is how we can relate pro...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2000