It is well known that a construction project is the process of resource consumption. Especially for large project, more kinds of resources are involved and the amount is very huge. In construction process of a project, the resource is limited and the time is very urgent, so for large scale project management there are some important subjects such as how to effectively distribute resources between each activities and how to effectively utilize limited resources. Therefore, it's of great importance to optimize the allocation of construction resource. This paper analyzes existing problems of resource allocation for large scale project, such as shortest construction duration with limited resource and resource leveling with stationary construction duration. Based on that, the corresponding mathematical optimization model is established and solution method on the basis of genetic algorithm is given. Comparing with traditional methods, better results are given when genetic algorithm is used, which can not only compress project duration in maximum, but also reasonably arrange activity starting time in uncritical path, and adjust the order of resource in different activities, to lower the peak of dynamic resource distribution curve as much as possible and to make resource consumption be in equilibrium state. Application in an engineering case shows that genetic algorithm can solve relative problems of resource allocation optimization in network planning for large-scale project very well and will be widely used in project optimization.
منابع مشابه
A Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm
In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...
متن کاملThe resource-constraint project scheduling problem of the project subcontractors in a cooperative environment: Highway construction case study
Large-scale projects often have several activities which are performed by subcontractors with limited multi-resources. Project scheduling with limited resources is one of the most famous problems in the research operations and optimization cases. The resource-constraint project scheduling problem (RCPSP) is a NP-hard problem in which the activities of a project must be scheduled to reduce the p...
متن کاملConcurrent control on resource planning and revenue/expenditure estimation in large-scale shell material embankment projects management using discrete-event simulation
Resource planning in large-scale construction projects has been a complicated management issue requiring mechanisms to facilitate decision making for managers. In the present study, a computer-aided simulation model is developed based on concurrent control of resources and revenue/expenditure. The proposed method responds to the demand of resource management and scheduling in shell material emb...
متن کاملParallel Genetic Algorithms for Optimizing Resource Utilization in Large-Scale Construction Projects
This paper presents the development of a parallel multiobjective genetic algorithm framework to enable an efficient and effective optimization of resource utilization in large-scale construction projects. The framework incorporates a multiobjective optimization module, a global parallel genetic algorithm module, a coarse-grained parallel genetic algorithm module, and a performance evaluation mo...
متن کاملA Genetic Based Resource Management Algorithm Considering Energy Efficiency in Cloud Computing Systems
Cloud computing is a result of the continuing progress made in the areas of hardware, technologies related to the Internet, distributed computing and automated management. The Increasing demand has led to an increase in services resulting in the establishment of large-scale computing and data centers, in addition to high operating costs and huge amounts of electrical power consumption. Insuffic...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- JCP
دوره 5 شماره
صفحات -
تاریخ انتشار 2010