A multi-start local search heuristic for ship scheduling - a computational study
نویسندگان
چکیده
We present a multi-start local search heuristic for a typical ship scheduling problem. A large number of initial solutions are generated by an insertion heuristic with random elements. The best initial solutions are improved by a local search heuristic that is split into a quick and an extended version. The quick local search is used to improve a given number of the best initial solutions. The extended local search heuristic is then used to further improve some of the best solutions found. The multi-start local search heuristic is compared with an optimization-based solution approach with respect to computation time and solution quality. The computational study shows that the multi-start local search method consistently returns optimal or near-optimal solutions to real-life instances of the ship scheduling problem within a reasonable amount of computation time. 2005 Elsevier Ltd. All rights reserved.
منابع مشابه
A multi Agent System Based on Modified Shifting Bottleneck and Search Techniques for Job Shop Scheduling Problems
This paper presents a multi agent system for the job shop scheduling problems. The proposed system consists of initial scheduling agent, search agents, and schedule management agent. In initial scheduling agent, a modified Shifting Bottleneck is proposed. That is, an effective heuristic approach and can generate a good solution in a low computational effort. In search agents, a hybrid search ap...
متن کاملA heuristic approach for multi-stage sequence-dependent group scheduling problems
We present several heuristic algorithms based on tabu search for solving the multi-stage sequence-dependent group scheduling (SDGS) problem by considering minimization of makespan as the criterion. As the problem is recognized to be strongly NP-hard, several meta (tabu) search-based solution algorithms are developed to efficiently solve industry-size problem instances. Also, two different initi...
متن کاملSolving Flexible Job Shop Scheduling with Multi Objective Approach
In this paper flexible job-shop scheduling problem (FJSP) is studied in the case of optimizing different contradictory objectives consisting of: (1) minimizing makespan, (2) minimizing total workload, and (3) minimizing workload of the most loaded machine. As the problem belongs to the class of NP-Hard problems, a new hybrid genetic algorithm is proposed to obtain a large set of Pareto-optima...
متن کاملSolving Parallel Machine Scheduling Problems with Variable Depth Local Search
We present new local search heuristics for the problem of scheduling jobs on identical parallel machines with the goal of minimizing total weighted completion time. Our proposed algorithm is a local search method based on combining a variable number of insertion moves. We develop an efficient heuristic for finding a profitable sequence of insertion moves. In a computational study, we compare th...
متن کاملA New Multi-objective Job Shop Scheduling with Setup Times Using a Hybrid Genetic Algorithm
This paper presents a new multi objective job shop scheduling with sequence-dependent setup times. The objectives are to minimize the makespan and sum of the earliness and tardiness of jobs in a time window. A mixed integer programming model is developed for the given problem that belongs to NP-hard class. In this case, traditional approaches cannot reach to an optimal solution in a reasonable...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Computers & OR
دوره 34 شماره
صفحات -
تاریخ انتشار 2007