Slab Track Design for High-speed

نویسندگان

  • Coenraad ESVELD
  • Valéri MARKINE
چکیده

If the low-maintenance characteristics of slab track on open line are to be retained, great care must be taken to ensure that the subgrade layers are homogenous and capable of bearing the loads imposed [2]. The slabs can be precast or poured on site. The most known tracks with precast slabs are Shinkansen line in Japan and Max Bögl slab track designed in Germany [2], while as examples of the tracks with on site poured slabs Rheda 2000 (Germany) and various designs of an Embedded Rail Structure can be mentioned [2].

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Study on different solutions to reduce the dynamic impacts in transition zones for high-speed rail

One of the most important factors influencing the track maintenance is the transitions between parts of the track with different vertical stiffness. The dynamic...

متن کامل

Developments in High-speed Track Design

Presently high-speed tracks are built on a large scale. Although ballasted tracks are still popular, more and more slab tracks are constructed. They have some significant advantages such as low maintenance, high availability, low structure height, and low weight. The main emphasis of this paper is on the application of non-ballasted concepts for high-speed operation. Special attention is given ...

متن کامل

New Analytic Method for Subgrade Settlement Calculation of the New Cement Fly-ash Grave Pile-slab Structure

At present, reducing subgrade settlement of soft soil foundation is a key problem in high-speed railway construction. Pile-slab structure is a widely-utilized form of foundation structure to reduce the subgrade settlement in China. In order to save the engineering cost for high-speed railway construction in developing countries, the author developed a pile-slab structure and named it as the new...

متن کامل

New Model of Cement Product – Precast Slab Track for Thsr (taiwan High Speed Rail)

The development of “slab track” was started by Japan in 1955 and the “Committee of slab track research” was established in 1971 for exclusive development of slab track. This makes Japan the country that has invested the most effort into slab tracks. On 5 January 2007, the THSR transferred from Japanese Shinkansen started its commercial operation. The stability and comfort of train operation hav...

متن کامل

Soft Foundation Strengthening Effect and Structural Optimization of a New Cement Fly-ash and Gravel Pile-slab Structure

Reducing the settlements of soft foundation effectively is a critical problem of high-speed railway construction in China. The new CFG pile-slab structure composite foundation is a ground treatment technique which is applied on CFG pile foundation and pile-slab structure composite foundation. Based on the experience of constructing Beijing-Shanghai high-speed railway in China, the settlement-co...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2006