Identifying Key Risks in Construction Projects: Life Cycle and Stakeholder Perspectives
نویسندگان
چکیده
Managing risks in construction projects has been recognised as a very important management process in order to achieve the project objectives in terms of time, cost, quality, safety and environmental sustainability. However, until now most research has focused on some aspects of construction risk management rather than using a systematic and holistic approach to identify risks and analyse the likelihood of occurrence and impacts of these risks. This paper aims to identify and analyse the risks associated with the development of construction projects from project stakeholder and life cycle perspectives. Postal questionnaire surveys were used to collect data. Based on a comprehensive assessment of the likelihood of occurrence and their impacts on the project objectives, this paper identifies twenty major risk factors. This research found that these risks are mainly related to (in ranking) contractors, clients and designers, with few related to government bodies, subcontractors/suppliers and external issues. Among them, “tight project schedule” is recognised to influence all project objectives maximally, whereas “design variations”, “excessive approval procedures in administrative government departments”, “high performance/quality expectation”, “unsuitable construction program planning”, as well as “variations of construction program” are deemed to impact at least four aspects of project objectives. This research also found that these risks spread through the whole project life cycle and many risks occur at more than one phase, with the construction stage as the most risky phase, followed by the feasibility stage. It is concluded that clients, designers and government bodies must work cooperatively from the feasibility phase onwards to address potential risks in time, and contractors and subcontractors with robust construction and management knowledge must be employed early to make sound preparation for carrying out safe, efficient and quality construction activities.
منابع مشابه
Determining Optimal Risk Assessment Model in Construction Projects (Case study: steel plant construction project)
Introduction: Identifying occupational hazards and managing occupational safety and health risks is the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. Method: This descriptive-analytic research has been written to determine the optim...
متن کاملارائۀ چهارچوبی جهت اولویتبندی ریسکهای موجود در واحدهای نمکزدایی نفت و گاز با استفاده از تلفیق تکنیک AHP فازی و مدل SWOT (مطالعۀ موردی واحد نمکزدایی نفتشهر)
Risk management is the process of systematically classifying, identifying, assessing, and responding to risks throughout the life cycle of a project in order to gain maximum utility of elimination, prevention, or risk control. There are various types of risks in oil projects which will damage precious national resources if checks and necessary planning are lacking. Regarding the importance of t...
متن کاملSafety risk assessment and ranking in the construction projects with F.M.E.A and fuzzy T.O.P.S.I.S
Abstract Introduction: Construction projects are one of the most important sectors of the economy of the country, which has a high capacity for job creation. Construction projects are part of a huge and strategic set of civil engineering projects that unfortunately have a large share of work-related accidents due to lack of attention to safety. One of the most important issues that can contrib...
متن کاملA Model for Prioritizing the Risks Associated with Road Construction Projects Based on Generalized Secondary Goal
This paper aims at providing a new model based on Data Envelopment Analysis (DEA) to prioritize project risks. It is clear that the large amounts of involved capitals, the long term of infrastructure projects’ implementation, and the project management problems in on-time completion of projects indicate the necessity of paying particular attention to this issue and conducting applied researc...
متن کاملCause and Effect Analysis of Risks of Refinery Developmental Turnkey Projects through System Dynamics Approach Case Study: Development Project of Third Distillation Unit and LPG (Liquefied Petroleum Gas) in Isfahan Oil Refinery
Project managers are grappling with a variety of risks today as a result of increasing complexity and dynamics of projects in different stages of project life cycle. Thus, it seems quite necessary to employ an efficient risk management process that can overcome the shortcomings of traditional methods in order to handle such complexities and reach the optimal project management. This matter is e...
متن کامل