Fuzzy Dynamic Scheduling of Multi-loop NCS
نویسندگان
چکیده
Abstract There are more problems of network data transmission in multi-loop NCS than in single loop NCS. It maybe lead to that one or more of closed-loop systems become unstable in multi-loop NCS. In order to solve this problem, a novel algorithm of fuzzy dynamic scheduling for multi-loop NCS is put forward in this paper. Firstly, the requirement of the sampling period of NCS is discussed. The necessity of dynamic scheduling for multi-loop NCS is analyzed. And then, the algorithm of fuzzy dynamic scheduling for multi-loop NCS is proposed. The idea is described form three parts.The principle of fuzzy dynamic scheduling is analyzed. The fuzzy controller is designed. The fuzzy dynamic scheduler is constructed. Finally, the simulation model of a multi-loop NCS with fuzzy dynamic scheduler is set up using TrueTime software. The relevant analysis of simulation is given. The result of study can prove that the performance of each closed control loop based on the same network platform is improved by adding fuzzy dynamic scheduler in the multi-loop NCS.
منابع مشابه
A Multi-Objective Fuzzy Approach to Closed-Loop Supply Chain Network Design with Regard to Dynamic Pricing
During the last decade, reverse logistics networks received a considerable attention due to economic importance and environmental regulations and customer awareness. Integration of leading and reverse logistics networks during logistical network design is one of the most important factors in supply chain. In this research, an Integer Linear Programming model is presented to design a multi-layer...
متن کاملA multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations
The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, t...
متن کاملThe Control Parametrization Enhancing Technique for Multi-Objective Optimal Control of HIV Dynamic
In this paper, a computational approach is adopted for solving a multi-objective optimal control problem (MOOCP) formulation of optimal drug scheduling in human immunodeficiency (HIV) virus infected by individuals. The MOOCP, which uses a mathematical model of HIV infection, has some incompatible objectives. The objectives are maximizing the survival time of patients, the level of D...
متن کاملAn Optimization Model for Multi-objective Closed-loop Supply Chain Network under uncertainty: A Hybrid Fuzzy-stochastic Programming Method
In this research, we address the application of uncertaintyprogramming to design a multi-site, multi-product, multi-period,closed-loop supply chain (CLSC) network. In order to make theresults of this article more realistic, a CLSC for a case study inthe iron and steel industry has been explored. The presentedsupply chain covers three objective functions: maximization ofprofit, minimization of n...
متن کاملModeling and solving multi-skilled resource-constrained project scheduling problem with calendars in fuzzy condition
In this study, we aim to present a new model for the resource-constrained project scheduling problem (RCPSP) considering a working calendar for project members and determined the skill factor of any member using the efficiency concept. For this purpose, the recyclable resources are staff resources where any person with multiple skills can meet the required skills of activities in a given time. ...
متن کامل