A Scenario State Representation for Scheduling Deferrable Loads under Wind Uncertainty
نویسندگان
چکیده
Integration of renewable energy in power systems is a potential source of uncertainty, because renewable generation is variable and may depend on changing and highly uncertain weather conditions. In this paper we present and evaluate a new method to schedule power-demanding tasks with release times and deadlines under uncertainty, in order to balance demand and uncertain supply. The problem is considered as a multiagent sequential decision making problem where agents have to deal with uncertainty. Our main contribution is a scenario state representation and an algorithm that computes a belief over future scenarios, rather than states. The algorithm is used to recompute the belief when new information becomes available. Experiments show that our method matches demand and uncertain supply to reduce grid power consumption, and outperforms an existing online consensus scheduling algorithm.
منابع مشابه
Irrigation scheduling and winter wheat grain yield estimation under precipitation uncertainty – A case study in Badjgah area (Fars Province, Iran)
Addressing deficit irrigation scheduling (DIS) for strategic crop production (especially wheat) under precipitation uncertainty is a priority for irrigation scheduling in drought conditions. This research investigated the precipitation uncertainty by enacting optimistic and pessimistic scenarios for the next 20 years by considering the statistical record of climate in Badjgah area. DIS was cond...
متن کاملModel Predictive Control for Deferrable Loads Scheduling
Real-time demand response is essential for handling the uncertainties of renewable generation. Traditionally, demand response has been focused on large industrial and commercial loads, however it is expected that a large number of small residential loads such as air conditioners, dish washers, and electric vehicles will also participate in the coming years. The electricity consumption of these ...
متن کاملIntegrated Inspection Planning and Preventive Maintenance for a Markov Deteriorating System Under Scenario-based Demand Uncertainty
In this paper, a single-product, single-machine system under Markovian deterioration of machine condition and demand uncertainty is studied. The objective is to find the optimal intervals for inspection and preventive maintenance activities in a condition-based maintenance planning with discrete monitoring framework. At first, a stochastic dynamic programming model whose state variable is the ...
متن کاملScheduling security constraint unit commitment for power system including stochastic wind power generation
This paper introduces a new approach for scheduling security constraint unit commitment (SCUC) including wind farms. Because of uncertainty in wind power production, we tried to develop a new method for incorporating wind power generation in power plant scheduling. For this, wind power generation modeled with unit commitment in a non-linear optimization problem and simulated by submitting diffe...
متن کاملStochastic Unit Commitment in the Presence of Demand Response Program under Uncertainties
In this paper, impacts of various uncertainties such as random outages of generating units and transmission lines, forecasting errors of load demand and wind power, in the presence of Demand response (DR) programs on power generation scheduling are studied. The problem is modelled in the form of a two-stage stochastic unit commitment (UC) which by solving it, the optimal solutions of UC as well...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره